21
Installation
6004067_a – 01.08.2018
EN
3.5.10 Establish electrical power supply
☞
Observe the voltage specifications on the ratings plate.
☞
Plug the cold device plug into the socket on the fan box.
☞
Plug the mains plug into the socket.
☞
Route the cable such that it is not kinked, crushed or
damaged and so that it will not get in the way when
replacing the filter filling.
☞
Make sure that the device can be disconnected on all
poles from the electricity supply after installation.
The device is ready for operation.
3.5.11 Check and carry out commissioning
D
ATTENTION!
Risk of disruptions due to moisture in the device!
If the device is moved from a cold environment into a hot
one, condensation may form inside.
☞
Wait about 2-3 hours before bringing the device into
service.
☞
Check that the mains plug is freely accessible or that
an all-pole isolating device (min. 3 mm contact gap) is
present.
☞
Check that the mains cable and the electrical connection
cable are not kinked, crushed or damaged.
☞
Ensure that air outlets are not closed or covered.
With installation of the device in kitchen units:
☞
Ensure that the ventilation slots (e.g. ventilation grill) are
available and clear.
☞
Check the correct functioning of the device.
D
Summary of Contents for Moveline BTH 100 ML
Page 35: ...35 6004067_a 01 08 2018 EN ...
Page 36: ...6004067_a 01 08 2018 ...