15
Installation
6006244_0 – 30.05.2022
EN
☞
Connect the earthing cable.
☞
Check that the mains cable and the electrical connection
cable are not kinked, crushed or damaged.
☞
Push the cover (placed loosely on the hood body) over
the support cable and the ceiling mounting plate.
☞
Screw in the lock nuts.
☞
Tighten the lock nuts to hand-tight.
☞
Switch the electricity supply on.
When using the recirculated air filter permalyt BUR BIH
(optional):
When the device is connected to the power supply for the
first time, this is confirmed by an acoustic signal.
y
30x beep (for 1 second respectively):
The device is not correctly connected.
☞
Check the connection from the device to the extractor
hood.
y
Constant tone (3 seconds):
The device is correctly connected.
y
Initial constant tone (3 seconds) followed by 2x beep:
The device is correctly connected, the extractor hood is
switched on, the connected wall box is closed.
The device is ready for operation.
Summary of Contents for Skyline Frame BIH 100 SKF
Page 28: ...6006244_0 30 05 2022 ...