12
Installation
6005736_0 – 25.03.2021
D
WARNING!
Risk of death due to explosions or electric shock!
Drilling through gas, water or electrical lines can lead to
hazardous situations.
☞
Ensure that there are no lines in the ceiling at the
fastening points.
☞
Align the drilling template parallel with the front of the
device.
☞
Determine the locations of the fastening points and mark
them with the help of the drilling template.
65
Ø 8
☞
Drill the holes in the ceiling.
☞
Insert the bolt anchors into the holes.
☞
Ensure that the bolt anchors are tight in the holes.
6
☞
Screw the nuts and the washers onto the bolt anchors in
the position of the two lock holes.
☞
Ensure that there is an approx. 6 mm gap between the
ceiling and the washer.
Summary of Contents for Smartline BIH 100 ST
Page 34: ...34 6005736_0 25 03 2021 ...
Page 35: ...35 6005736_0 25 03 2021 ...
Page 36: ...6005736_0 25 03 2021 ...