19
Installation
6005736_0 – 25.03.2021
EN
1.
2.
3.
3.
2.
☞
Pull the inner chimney element upwards and align the
height of the chimney cover.
☞
Gently bend the chimney cover apart and when doing so
insert the chimney cover at the top:
y
At the front into the openings on the ceiling
mounting panel.
y
On the side on the snap lock nipples.
1.
2.
3.
3.
☞
Hold the front chimney cover at an angle.
☞
Fit the holes in the chimney cover down on the screws.
☞
Fold the chimney cover to the chimney stack.
☞
Gently bend the chimney cover apart and when doing
so set the chimney cover sideways onto the snap lock
nipples.
1.
2.
2.
3.
3.
☞
Pull the inner chimney element upwards and align the
height of the chimney cover.
☞
Gently bend the chimney cover apart and when doing so
insert the chimney cover at the top:
y
At the front into the openings on the ceiling
mounting panel.
y
On the side on the snap lock nipples.
Summary of Contents for Smartline BIH 100 ST
Page 34: ...34 6005736_0 25 03 2021 ...
Page 35: ...35 6005736_0 25 03 2021 ...
Page 36: ...6005736_0 25 03 2021 ...