11
Installation
6005736_0 – 25.03.2021
EN
3.5.3
Determining the hanging position
The device is designed to be hung on ceilings.
When mounting on a solid ceiling:
☞
Make sure that the ceiling has sufficient load bearing
capacity.
☞
Use the fastening materials provided.
With different installation situations:
☞
Enquire about alternative fastening systems (e.g. consult
with your architect).
☞
Only use fastening hardware suitable for the type of
ceiling.
The chimney stack is preassembled in the factory to a height
of 750 mm. In order to adjust the height of the chimney stack
to the assembly situation, perform the following steps:
☞
Detach the stiffening plates from the chimney stack.
☞
Unscrew the screws and nuts for the corner connections.
☞
Adjust to the desired height in 50 mm steps.
☞
Secure the corner connections once more with the
screws and nuts.
☞
Screw the stiffening plates back on the chimney stack in
the previous position.
☞
Make sure that the chimney stack is bolted tight.
View from the front
x
=
=
Safety distance (x):
y
Recommendation 700 mm.
y
With electric hobs, at least 600 mm.
y
With gas hobs, at least 650 mm.
Observe the specifications for the cooking appliances
(e.g. installation above a solid fuel stove).
☞
Make sure that the safety distance is complied with.
View from above
272
=
=
220
=
=
☞
Determine the hanging position.
☞
Mark the centre point of the device on the ceiling.
Summary of Contents for Smartline BIH 100 ST
Page 34: ...34 6005736_0 25 03 2021 ...
Page 35: ...35 6005736_0 25 03 2021 ...
Page 36: ...6005736_0 25 03 2021 ...