GENERAL INFORMATION

4

6  TECHNICAL SPECIFICATIONS

DESCRIPTION

IDRA MS

150

Type of storage cylinder

Vertical, glazed

Heat exchanger layout

Vertical, with elliptical section

Storage cylinder capacity

162

l

Diameter of storage cylinder with insulation

604

mm

Diameter of storage cylinder without insulation

-

mm

Height with insulation

1088

mm

Height without insulation

-

mm

Insulation thickness

52

mm

Total net weight

62

kg

Quantity/diameter/length of magnesium anode

1/33/300

mm

Flange internal diameter

130

mm

Diameter/length of sensor sockets

16/180

mm

Coil water capacity

4,25

l

Coil heat exchange surface area

0,85

m

2

Maximum operating pressure of storage cylinder

10

bar

Maximum operating pressure of coils

10

bar

Maximum operating temperature

99

°C

Discharges according to EN 12897:2006 ∆T=45 °C 

(ambient 20°C and storage at 65°C)

55

W

Discharges according to UNI 11300

1,22

W/K

Energy class

B

Continuous availability of domestic water (DHW 10-45°C) at the different coil inlet temperatures and with the 

indicated delta (∆) T°.

Coil delivery temperature
80°C 

∆T 20°C

27

kW

660

l/h

70°C 

∆T 20°C

19

kW

480

l/h

60°C 

∆T 10°C

11

kW

280

l/h

50°C 

∆T 10°C

8

kW

190

l/h

Set-up time required to heat the boiler to 60°C (coil probe point reference) with primary exchanger at the indi-

cated delivery temperature and with the indicated delta (∆) T°.

Coil delivery temperature

80°C 

∆T 20°C

35

min

70°C 

∆T 20°C

39

min

Set-up time required to heat the boiler to 55°C (coil probe point reference) with primary exchanger at the indi-

cated delivery temperature and with the indicated delta (∆) T°.

Coil delivery temperature

60°C 

∆T 10°C

45

min

Set-up time required to heat the boiler to 45°C (coil probe point reference) with primary exchanger at the indi-

cated delivery temperature and with the indicated delta (∆) T°.

Coil delivery temperature

50°C 

∆T 10°C

56

min

NL thermal efficiency coefficient according to DIN 4708. The NL index indicates a number of apartments having 

3 5 people that can be fully supplied, with a 140 l bathtub and two other drawing points 

Coil delivery temperature

80°C

1,84

70°C

1,44

60°C

1

50°C

0,75

Summary of Contents for IDRA MS 150

Page 1: ...Installation and Operation Manual Storage cylinder IDRA MS Installation and Operation Manual EN ...

Page 2: ... improper installation adjustment maintenance or use b The product must be serviced at least once a year Servicing must be arranged in advance with the B Technical Assistance Centre b All servicing and repairs must be performed by a qualified heating engineer b If water leaks from the storage cylinder turn off the water supply and contact B s Technical Assis tance Centre or a qualified heating eng...

Page 3: ...for easy cleaning and mainte nance of the anti corrosion magnesium anode 4 IDENTIFICATION The B IDRA MS solar heaters can be identified by Data plate This lists the technical specifications and performance of the product BALLON Modele Model Fabrication Année bar W l W kW l h BOLLITORE Modello Codice Matricola Anno m2 kW T067774IFE T067774IFE BOILER Year Serial number V Hz Potenza elettrica assorbi...

Page 4: ...DHW 10 45 C at the different coil inlet temperatures and with the indicated delta T Coil delivery temperature 80 C T 20 C 27 kW 660 l h 70 C T 20 C 19 kW 480 l h 60 C T 10 C 11 kW 280 l h 50 C T 10 C 8 kW 190 l h Set up time required to heat the boiler to 60 C coil probe point reference with primary exchanger at the indi cated delivery temperature and with the indicated delta T Coil delivery tempe...

Page 5: ...oil probe point reference and pri mary exchanger at the indicated delivery temperature considering an increase of the domestic water tempera ture of 30 C between inlet and outlet according to EN 12897 Coil delivery temperature 60 C 223 l Quantity of domestic water obtained in 10 with boiler pre heated to 45 C coil probe point reference and pri mary exchanger at the indicated delivery temperature c...

Page 6: ...NISATION When installing B IDRA MS storage cylinders in old sys tems or systems requiring modernisation always perform the following checks Make sure that the system is fitted with safety and control devices in accordance with applicable legis lation and standards Make sure that the central heating circuit has been flushed out to remove all sludge and lime scale and has been vented and seal tested...

Page 7: ... 33 300 mm DF Flange internal diameter 130 mm A 171 mm B 243 mm C 323 mm D 431 mm E 523 mm F 663 mm G 920 mm H 1088 mm I 604 mm L M8 threaded inserts for grounding point accessory handles connection 700 mm b We recommend that you install isolating valves in the outlet and return lines b Check the efficiency of the seals when filling refilling the storage cylinder b In case of a probe any electric ...

Page 8: ...ricity supply ON at the mains power switch and at control panel switch if fitted 14 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C set the heater tem perature control where available to the minimum value b If the temperature to which the heater is exposed can fall below 0 C frost ...