background image

 

 

 

 

4. Setting 

4.1. Room requirements 

 

-

 

The compressor requires no foundations. It must be positioned on a hard and even surface. Take 
into consideration the floor load capacity, if the machine is installed in a building. 

-

 

Strictly  observe  the  minimum  distances  from  walls  and  other  machines.  When  several 
compressors  are  installed,  pay  attention  to  the  direction  of  cooling  air  flow;  no compressor 
should suck air which is heated by other machine. Minimum distances from  the room walls and 
other objects are given in the drawings below. 

-

 

Protect the room in which the compressor is installed from negative temperatures. The inlets and 
outlets  to  and  from  the  room  should  be  located  in  such a  manner  to  protect  the  interior  from 
weather conditions. 

-

 

Heat generated during compression should be extracted  outside (or to other rooms),  and fresh 
air should be supplied from the outside. 

-

 

If the gravity ventilation is insufficient (windows, openings in a wall etc.) in the compressor room, 
air exchange should be provided by fans. To ensure correct heat extraction, the fans should have 
total capacity about 15 to 20% higher than the total cooling air requirement for all compressors 
installed in the room. The required cooling air volume  is specified in the Technical Data section.  

-

 

Ambient temperature in the room should be from + 5

C to +40

C.  

-

 

Provide sufficient room for maintenance operations. 

-

 

It  is  necessary  to  consult  our  specialists  when  you  want  to  install  a  duct  supplying  air  from 
the outside or use air for heating the rooms. 

-

 

The  compressor  room  should  be  well  lighted  to  ensure  trouble-free  and  safe  service  of  the 
equipment. 

-

 

To improve ventilation in the compressor room, the machine can be connected to the discharge 
air duct; in such case, please contact BERG.  

 

The suitable ventilation in a room will prevent the possibility of negative pressure  generation or 
undesired temperature increase.  
 
When there are any problems in ensuring the suitable ventilation in a room, please contact BERG.   
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 

Summary of Contents for KOMPBERG ZX90

Page 1: ...OPERATING AND MAINTENANCE MANUAL Oil free screw compressor KOMPBERG ZX90...

Page 2: ...the choice you have made and the cooperation you started with us Our compressors are machines of top quality which is the guarantee for a long years and reliable performance Our sales and service sta...

Page 3: ...w compressor KOMPBERG ZX90 operating description 12 Technological diagram 14 6 Start up 17 6 1 Start up preparation 17 6 2 Restart after longer downtime 18 7 Maintenance 19 7 1 General requirements 19...

Page 4: ...e and maintenance of the compressor and control system Technical documentation of the electrical part It includes the data necessary to perform correct connections and repairs of the electrical equipm...

Page 5: ...gases it is required to obtain the manufacturer s consent The above consent must be in written form The compressor must not be used for any other purposes that are non compliant with its intended use...

Page 6: ...referred to as the Warrantor provides the warranty for the products sold ensures correct operation of the offered products provided that they are used in accordance with their intended use and operat...

Page 7: ...such a way that they do not place pressure on it If the transport harness is fastened and secured incorrectly the machine may get damaged The compressor must be transported only with a forklift Fasten...

Page 8: ...rohibited to service the safety valves or to change their settings Do not change settings of the pressure switches above the value given in the identification plate or in the Operating and Maintenance...

Page 9: ...eed 130dB Equivalent acoustic pressure level corrected by A characteristic does not exceed 85 db A AUTOMATIC MACHINERY MAY START RISK OF SCALDING RISK OF ELECTRIC SHOCK Type KOMPBERG ZX90 Overpressure...

Page 10: ...ntilation is insufficient windows openings in a wall etc in the compressor room air exchange should be provided by fans To ensure correct heat extraction the fans should have total capacity about 15 t...

Page 11: ...electrical connections Use the required safety measures in accordance with the suitable regulations Calculate the power cable cross sectional area and fuse sizes according to the local regulations an...

Page 12: ...5 Screw compressor operating description 5 1 Screw compressor KOMPBERG ZX90 operating description General view of an oil free screw compressor KOMPBERG ZX90...

Page 13: ...and then flows to the oil filter assembly 18 The oil filter set is fitted with a thermostat 17 which depending on the oil temperature directs the oil directly through the oil filter 18 to the manifol...

Page 14: ...25 Solenoid valve with time system 8 Venturi nozzle 26 Air filter pollution sensor 9 2nd stage cooler 27 Temperature sensor 10 Check valve 28 Safety valve 11 2nd stage unloading 29 Pressure sensor 12...

Page 15: ...correctness of the lubrication and sealing processes Therefore these spaces must be ventilated This is accomplished by means of a flexible hose and an air filter located at the tunnel of the fan In th...

Page 16: ...itched off and on the compressor can be started by unlatching the EMERGENCY STOP STOP AWARYJNY button and pressing the START button The compressor is provided with an additional protective function wh...

Page 17: ...ons are in place do not connect the compressor to a power source of different voltage than that specified in the Operating and Maintenance Manual Connect the phase conductors so that the rotation dire...

Page 18: ...t switches to the stand by mode and starts again after its drop Incorrect rotation direction of the screw block rotors for more than 5 seconds will damage the screw compressor Proper direction of scre...

Page 19: ...e components Take appropriate safety measures against toxic vapours from cleaning agents Biodegradable detergents should be used The workplace must be kept absolutely clean when maintenance work is ca...

Page 20: ...he filter is recommended check the condition of the elastic coupling clean the air and oil cooler ribs if necessary 7 2 4 Warranty and post warranty checks every 2000 work hours or after 1 year change...

Page 21: ...ot apply force avoid damaging the cartridge Clean contact surfaces of gaskets Purging purge the external surface of the cartridge with dry compressed air at the pressure up to 0 5 MPa askew from the i...

Page 22: ...ner to replace the filter Caution hot oil Rub some oil onto the gasket of the new filter before screwing it in Fill the new filter held vertically with the same type of oil as that in the separator ta...

Page 23: ...lves in the radiator see the controller operating instructions Unscrew the compressor crankcase ventilation hose on the compressor stage body see Fig 11 Place a suitable container and carefully unscre...

Page 24: ...ridges should be disposed of according to the valid legislation on handling wastes waste code 16 01 07 7 3 7 Oil cooler exchanger interstage final air The safety of the screw compressor requires regul...

Page 25: ...restarted after removing the cause of any failures Periodic motor inspections The motor inspection should be performed at least once per 2 years The inspection should be performed by the in house pers...

Page 26: ...lves delivered require no special maintenance They should only be periodically every 1000 hours blown by pulling the handle of the push pin Special care must be taken while performing this operation K...

Page 27: ...e the set value adjust the pressure switch or enter correct settings in the controller oil level too low top oil up as required oil thermostat malfunction replace the entire thermostat or its cartridg...

Page 28: ...alve damaged replace with a new one with appropriate setting or call service wrong microprocessor controller setting adjust the correct settings in the controller damaged pressure transducer call the...

Page 29: ......

Page 30: ...er Quantity 1 Air filter BL 480146 BL 480169 1 2 Compressed air filter cartridge Element for F 24 GW 24 G 1 3 Oil filter B 480001 1 4 Coupling insert BS 480165 1 5 Oil l 480069 40 l 6 Thermostat cartr...

Reviews: