USER MANUAL 1.2 | B-NIMIS MC-PI AND BC-PI SERIES
Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | Germany | www.berghof-automation.com
22
2
1
5.
Assembly
5.1. Installation
B-Nimis MC-Pi & BC-Pi modules are intended for installation on mounting rails (according to DIN
EN 60715, 35 x 7.5 mm).
→
Guide the device from below towards the
mounting rail as shown in the image so
that the metal spring snaps into place be-
tween the mounting rail and the mounting
surface.
→
Press the module at the top against the
mounting wall until it snaps into place.
Fig.: 3 Installing the B-Nimis MC-Pi & BC-Pi
NOTICE
There must be at least 100 mm clearance above and below the MC-Pi & BC-Pi.
This guarantees the necessary convection cooling for the MC-Pi & BC-Pi. The mounting plate
must be made of metal to ensure heat conduction.
Connecting two modules
After snapping the first module onto the rail, snap on the second module about 1 cm away, to the
right of the first module. Push the second module along the rail towards the first module until the
release latch snaps into place.