4. Commissioning
6) Actuate the
RESET
button.
7) After the connection to the electrical mains the
rotational direction of the motor must be
tested.
For this purpose press the
ON
switch
.
If the rotational direction is correct the com-
pacting piston will move backward.
If this is not the case, the ma-
chine must be disconnected from
the mains immediately and the
rotational direction of the motor
must be changed.
This can have two causes :
* Two of the three phases in the supply line
were switched.
This work is only to be carried
out by a qualified electrician.
or
* The implement hitch on your machine is
equipped with a phase inverter.
The phases are hereby switched by the
insulating part being rotated by 180° by
applying light pressure to a lock.
4.
03
L1
L2
L3
Summary of Contents for ALPHA-PACK-BIN
Page 2: ......
Page 6: ......
Page 16: ......
Page 20: ......
Page 28: ......
Page 34: ......
Page 50: ......
Page 52: ......
Page 53: ...10 Dimensions 10 01 Illustration standard version deviations are possible ...
Page 54: ......
Page 60: ......
Page 64: ......
Page 66: ......
Page 68: ......
Page 70: ......
Page 72: ......
Page 74: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 84: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......