6
1
e
g
a
P
Installation Instructions
Using Optional Low Clearance Ceiling Mounting Kit BPL-HAB40 & BPL-HAB50 Only
Step 2.
Install heat shield
mounting brackets
(as shown)
using 5/16" X 3/4"
Hex Socket (Qty 4)
hardware supplied.
Step 1.
Mount Hanging Bracket
Assembly to ceiling
using 3/8" X 3" long
"Lag Bolt" or "Anchor Bolt"
(Qty 4) not supplied.
Step 3.
Slide Heat Shield
over brackets
(as shown)
9.00
Use these
two bolt holes
to attach bracket
to extension arm
refer to
step 4
.
Step 4.
Install Extension
Arm brackets
(as shown)
using 5/16" X 3/4"
Hex Socket (Qty 4)
hardware supplied.
Use these
two bolt holes
to attach heater
to Hanging bracket
assembly
in
step 1
.
Step 5.
Attach heater to
Brackets as shown
using 1/2" X 1" long
Hex Bolts (Qty 4)
hardware supplied.
March, 2013
BERNER PATIO+ Luminous