2
/ Table of contents
TABLE OF CONTENTS
WARNINGS
___________________________________________________________________
DATA RATING LABEL
___________________________________________________________
BEFORE INSTALLATION
________________________________________________________
VENTILATION PREPARATION
____________________________________________________
SPECIFICATIONS
______________________________________________________________
CLEARENCE DIMENSIONS
______________________________________________________
INSTALLATION REQUIREMENTS
_________________________________________________
Electrical
___________________________________________________________________
Gas
________________________________________________________________________
ELECTRICAL CONNECTION
_____________________________________________________
WIRING DIAGRAM
_____________________________________________________________
GAS CONNECTION
_____________________________________________________________
Manual shut-off valve
_________________________________________________________
Flexible connections
__________________________________________________________
Pressure test-point stopper valve
_______________________________________________
Pressure regulator
____________________________________________________________
INSTALLATION
________________________________________________________________
Unpackaging the range
________________________________________________________
Removing the oven door
_______________________________________________________
Installing the legs
_____________________________________________________________
Installing the worktop frontguard
________________________________________________
Installing the island trim
_______________________________________________________
Installing backguard (optional)
__________________________________________________
INSTALLING THE ANTI-TIP DEVICES
______________________________________________
Anti-tip brackets
______________________________________________________________
Anti-tilt chain
________________________________________________________________
GAS CONVERSION
_____________________________________________________________
INSTALLATION CHECKLIST
______________________________________________________
FINAL PREPARATION
___________________________________________________________
BERTAZZONI SERVICE
_________________________________________________________
4
6
6
7
7
9
10
10
10
10
11
12
12
12
12
13
14
14
14
15
15
16
16
17
17
17
18
22
22
23