7. Startup of the HPLC System
FlowStar2 LB 514
56
7.2 Electrical Connections
The numbered cables (LB ...) are included in the shipment.
Connect
the
measuring
system
to
one
power
phase.
Connect the entire measuring configuration including all units (such as: gradient
controller, UV or other detectors with connected evaluation units and computer)
to
one
power phase; otherwise, trouble may occur in the microprocessor units.
Use a multipole connector which is connected to the wall outlet.
Mains connections:
1.
FlowStar² (Main)
cable no. LB 75800-25
Mains
2.
FlowStar²
(Ratemeter)
cable with open ends
Integrator
3.
FlowStar²
(Ext. Control)
cable with open ends
Ext. control
4.
FlowStar²
(Pump ser.)
cable no. ID 26204*
Scint. pump
5.
FlowStar²
(USB)
USB cable A-B
Computer
6.
FlowStar²
(Waste/FC)
cable with open ends
Fraction collector
*) The cables marked by an asterisk (*) are not included with the shipment
if no pump is ordered. They are part of the pump acceesories.