The roof boarding is already cut to the 
correct length so that you only have to 
lay the boards from front to back.

Begin at the front and align the 

fi

 rst 

board 

fl

 ush at the front with the ridge/

centre purlin and the fascia board. 
Make sure you align the board exactly 
with the centre of the ridge purlin. This 
is necessary to avoid protruding wood 
at the ridge which would prevent the 
mounting of the opposite boards.

Now nail the boards twice to the ridge/
centre purlin and the fascia board. 
Lay the roof boarding all the way to 
the back. Measure in regular intervals 
to ensure that they are properly alig-
ned and that the spacing to the wall is 
consistent. The backmost (

fi

 nal) board 

needs to be cut to size in most cases. 
Afterwards, mount the remaining 
boards on the other side as described 
above.

Now mount the 

gable boards

 at the 

front and back. Fix the gable boards 
with screws to the roof boarding and 
the ridge/centre purlin; the spacing 
between the upper edge of the gable 
board and the upper edge of the roof 
boarding should be approx. 5-6 cm.

(It may help if you indicate the centre 
on the ridge purlin with a pencil line. 
This will keep you from unintentionally 
exceeding the centre of the ridge pur-
lin.)

Mount the 

fascia boards

 with screws 

to the roof boarding.

Make sure the upper edge of the board 
does not extend beyond the roof boar-
ding.

S

TEP

 5

The roof boarding

6

We are not responsible for damages during assembly!

Summary of Contents for Log cabins

Page 1: ...Generally two persons are required for the assembly it is recommended to have a third person assist with larger summer houses ASSEMBLY INSTRUCTIONS Recommended tools Cordless screwdriver Pliers Spiri...

Page 2: ...ages The house key You will find the house keys on the side of the door fixed with a screw Remove them prior to the installation of the door to avoid damages IMPORTANT Please have a close look at the...

Page 3: ...rs once in the centre of the corner joints to the foundation beam underneath Arran ge the remaining foundation beams with the same spacing in the interior of the summer house The simplest way is to ma...

Page 4: ...s check the number of assembled plank rows against the number in the drawing to prevent errors Door installation Insert the door into the summer house when you get to the third plank row Take the door...

Page 5: ...operly If neces sary tap the left and right hand side of the gable with a hammer to make sure it is attached properly to the wall This also applies for the rear gable Insert the two centre purlins int...

Page 6: ...d that the spacing to the wall is consistent The backmost final board needs to be cut to size in most cases Afterwards mount the remaining boards on the other side as described above Now mount the gab...

Page 7: ...ory at your specialist supplier Roll out the roof felt from one side to the other beginning at the lower part of the roof Allow a few protruding centimetres and cut the excess felt off Fix the roof fe...

Page 8: ...th the assembly of your summer house please ask your specialist supplier for help He will gladly assist you Bertsch Holzbau rejects any warranty for damages resulting from incorrect assem bly or gross...

Reviews: