12#3(45&"5$(#3(6789:#'2;+%<(=&%+:(;2+(6789:#'2;($5>3?(;2#3(45&"5$
459(&7;(@+(678#+%?(#&(>27$+(7:(#&(85:;?(>#;27";(67&3+&;(A:74

((((((B!)(C7$%#&'3?(DDE (((((F((E789:#'2;(-0--

Manufactured by RBS Holdings, LLC

205 Arlington Drive              Greenville, PA   16125

Remove Watermark

Wondershare

PDFelement

Summary of Contents for arlington 1220

Page 1: ...Assembly Book Best Barns USA 0 12 3 45 5 3 6789 2 2 6789 2 5 3 2 3 45 5 459 7 678 27 7 85 27 67 3 A 74 B C7 3 DDE F E789 2 0 Manufactured by RBS Holdings LLC 205 Arlington Drive Greenville PA 16125 R...

Page 2: ...A Z5 3 7 6 3 M5 R8 7 5 S E5 O B I 77 S 77 A 77 3 37 78 7 5 9 7 459 62773 7 97 7 7 87 5 6 4 85 1 4 7 7 9S P 5 G E7 A 4 67 3 5 5 0 3 M 4 G E7 A 4 5 3 5 33 3 5 3 5 2 U 65 9 5 M 5 G 178 5 7 74 _3 3 7 A 54...

Page 3: ...Jd 585 Material Description 12 x 20 _ 1 5 76O 863 J _ M1 g7 3 C 5 3 863 J _ M1 g7 3 C 5 3 863 _ M1 I 77 g7 3 f 863 _ _ 1 5 B 3 _ 863 J _ _ 1 5 B 3 _ 863 I 77 LhJd 7 ih_d J 863 _ J Y5 U 8 5 I 77 Z5 3...

Page 4: ...2 7A __d M73 7 2 75 3 7 2 5 65 2 e 45 O3 2 2 5 3 3 765 24 23 1 4 __d Wall Plate 24 144 Wall Plate Pre Cut Wall Studs b 3 5 WfX 3 U 8 G6 5 3 3 2 78 7 74 8 5 3 Z5 3 3 7 5 8 5 3 2 0 3 O 3 W X 7 5 3 7 56...

Page 5: ...765 H5 O 5 E 5 9 2 A 3 7 3 45 O3 12 3 3 A 6 5 5 3 8 i b 3 5 WVX 3 8 G6 5 3 3 2 78 7 74 8 5 3 2 W X 7 0 3 O 3 7 562 24 19 3 4 VG h d Wall Plates 24 Top Wall Plate Bottom Plate 75 Long 2x8 48 OSB Fille...

Page 6: ...7 2 78 8 5 5 7 5 7 2 5 3 0 3 O 3 Install these Studs Centered b 3 5 WVX 3 8 G6 5 3 3 2 5 8 5 3 2 327 33 33 J b 3 5 5 A 2 3 85 7 2 2 3 7A 2 5 85 E 3 53 8 U 7 3 9 3 6 LAP Edge Flush Flush Cut Siding Flu...

Page 7: ...4 Below Plate Cut 2x4 Plate from Opening Tip If you are erecting building on a wood floor insert nails between the 3 4 floor sheathing and the 2x4 floor frame Rest the siding on the nails while naili...

Page 8: ..._3 7 2 78873 3 5 i E W X 7 7 _3 7 A 3 5 8 5 3 5 3 5 7 A 7 5 56O 5 3 Cut 2x4 12 to Fit 2x4 8 Tie Plate Step 7 Install Metal 2x4 Joist Hangers b 3 5 W JX 2 _ a7 3 25 3 5 2 2 5 3 3 7 7 2 3 5 3 3 5 327 _...

Page 9: ...mb The building width should be 12 0 measuring from the outside of the 2x4 tie plates 4 x 8 E W X _G 75 3 7 5 2 7A ifd 5 3 5 2 4 5 25 3 3 G h d 25 5 3 Before installing floor sheathing consider where...

Page 10: ...l Loft Floor Sheathing continued Siding Filler OSB Filler D765 WiX 2 d _JGih_d A 3 83 Z5 2 3 7 78 7A 2 3 7 2 56O 5 3 V 5 U 5 3 b 3 5 W X 7 d 7 i 4 75 3 53 67 4 7 2 56O 5 E 2 37 4 3 A 32 2 78 7A R A 5...

Page 11: ...27 7 2 5 67 6 9 2 7 74 _3 3 5 2 5 4 53 G0d A 74 7 Pre built gable ends highlighted in gray i 1 487 5 9 56O _ 76O3 7 7A A 77 5 7 2 A 54 4 4 3 12 3 76O3 JdG d 7 5 459 25U 5 3 H5O 3 W X 7 7A 2 3 76O3 5 8...

Page 12: ...G6 5 3 7 O A 7 2 3 5 5 3 85 2 5 7 5 7 2 3 b 3 5 A 32 2 7A A 54 5 ih_d 7 2 7 74 _ 8 5 3 V 5 U 5 3 3856 Jd 585 L D765 W X 7 L0Gih_d 7 _3 b 3 5 2 3 P 5 9 3856 A 74 6 7A 2 5 6 2 7 74 _ 7 2 5 3 3 3 W X 7...

Page 13: ...4 b 3 6 7 3 5 856O 2 7 7 b 3 5 U 35 7 3 5 2 7 5A 2 5 3 3 30 3 4 Long 2x4 77 3 8 Long 2x4 Do not remove the temporary 1x4 blocks until the roof trusses and back gable are assembled D765 W X 7 ffGihJd 7...

Page 14: ...5 5 3 2 33 3 B 47U 2 _ 76O3 25 3 6 2 7 74 5 8 5 5 873 7 7 O 8 5A 3 5 D765 5 JG h d 7 _ 76O 2 5 3 5 3 5 5 8 5O 6 5A 3 5 76O 5 8 5O 2 5 77 33 b 3 5 2 W _X A7 V 67447 5 3 i b 3 5 33 3 7 33 3 T 5 K b 3 5...

Page 15: ...building See lower detail 5 5 56O 5 3 5 33 9 3 3 7U _ A 77 a7 3 1 33 3 327 3 A 5 5 78 A 77 a7 3 6 2 W 0X V 67447 5 3 7 7 2 3 3 99 Corner Trim 3 8 Gauge Block D765 5 ihJd id Jd 3 5 76O 856O 2 25 5 5 M...

Page 16: ...Gih_d _Jd 37AA 85 3 H 53 A 74 6 7A A 3 33 7 7A 37AA 7 5 E 5 37AA 85 7 2 3 2 H5O 3 DKM 3 2 3 6 7AA _ Z5 2 37AA 85 7 2 7A 2 _3 Detail C 7 L b 3 5 47 37AA 85 3 5 7 2 3 7A 2 6 2 53 37AA 85 A 32 2 2 _ 7 2...

Page 17: ...6 7A 2 _ b 3 5 2 V 75 37 2 78 7A 2 75 3 5 2 2 78 7A 2 33 3 12 77A 32 5 2 installed later 327 3 7 2 A536 5 3 5 3 5 2 53 327 7 3 V 5 U 5 3 Step 21A Install Roof Sheathing Plyclip Cut From 48 x96 88 7 67...

Page 18: ...77A 32 5 2 562 33 5 2 78 7 3 5 7 8 U 7 3 85 A 32 b 3 5 5 i0G h d 7 _ 2 77A 32 5 2 5 2 37AA 85 i B 8 5 7 78873 3 Step 21B Install Roof Sheathing continued Step 22 Install 2x4s in Front overhang K 856 4...

Page 19: ...Jd f d 8 4 a54 45 5 7 2 78 7A 2 77 78 A 32 2 2 A 7 5 3 3 V 5 U 5 3 Step 23 Install Door Flashing 3 1 2 x5 Flashing D765 W X 7 iG h d Ld 4 5 A 532 5 5 7 2 7 0 3 b 3 5 5 562 67 7A 2 77 78 12 3 67U 2 3 8...

Page 20: ...887 533 4 9 2x8 Door Header View From Inside View From Inside Screw Used as Spacer Treated Sill Board Notch in Sill Building Tip run a bead of caulking where flashing treated sill and aluminum sill me...

Page 21: ...O 7 3 7 2 3 56O 5 7 Step 26A Install Doors 6 2 77 2 2 3 5 4 75 853 2 _ A 54 see detail below 5 7 2 3 7A 3 2 7 3 7 2 A 3 56O 53 327 7 bA 3 6 335 9 7 5 a 3 2 77 2 2 7 7 7 2 77 65 3 65 5 a 3 D773 36 3 25...

Page 22: ...7 74 7A _ A 54 7 7 5 27 2 A 77 A7 2 7 325A 7 78 7 i b 3 5 5 4 5 8 5 7 2 7 56O 7A 7 2 77 12 5 O 8 7 2 77 3 5 2 6 73 _ I 74 2 7 3 3 5 2 77 25 3 5 76O 77 2538 7 2 7 3 7A 2 77 3 Angled Metal Plate Drill H...

Page 23: ...h 3P 5 Supplied by Local Supplier j 9 _i 863 _ M G6 5 3 f 863 _ G 5 1 M 5 3 863 _ G J 5 1 M 5 3 J 863 _ G 0 5 1 M 5 3 863 J G J T77 C 5 L 863 N 7 _ J 863 R 2 5 2 _ J Qty Material Shipped in 4 Extensio...

Page 24: ...5 _ d E7 1 4 _ 5 Vd 0_d Y5 1 4 fh Vd _Jd _d R 2 5 2 fh Vd _Jd L d R 2 5 2 fh Vd _Jd _Jd R 2 5 2 fh Vd _Jd fLd R 2 5 2 _ fh Vd Gih_d _Jd R 2 5 2 fh Vd Gih_d L d R 2 5 2 fh Vd Gih_d L G h_d R 2 5 2 _ f...