Step 12B
Install Gable Siding continued
Step 13
Install Gable Overhang
_<
b&3;5$$($53;(3#%#&'(85&+$<
i<
b&3;5$$(6+&;+:(3#%#&'<(bA(97"(8":6253+%(5(3"&@":3;(>#&%7>(97"(459(6";(;2+(78+&#&'(#&(;2+
3#%#&'(5;(;2#3(;#4+<(b&3;:"6;#7&3(5:+(856O+%(#&(;2+(>#&%7>(@7/<(b;(#3(5%U#35@$+(;7(#&3;5$$(;2+
>#&%7>(5A;+:(;2+('5@$+(#3(3+;
30-3/4" Long 2x4
77-3/8" Long 2x4
Do not remove the temporary 1x4 blocks until
the roof trusses and back gable are assembled.
,<
D765;+(W-X(;>7(ffGihJd($7&'(-/_(:5A;+:3(7&('5@$+<(b&3;5$$(-/_3(A$"32(>#;2(;2+(;78(7A('5@$+
A:54+<(=3+(,0%(3#&O+:3<
-<
D765;+(W-X(;>7(i0G,h_d($7&'(-/_(:5A;+:3(5&%(#&3;5$$(;7(A# <(-/_3(>#$$(+/;+&%(@+97&%(+&%(7A
'5@$+<