background image

Step 8

Install Loft Floor

Step 9A

Install Loft Floor Sheathing

Before installing floor sheathing consider where to locate the 2' x 4' access
opening. The detail below shows two possibilities. Regardless of desired
layout it is important to install sheathing staggered.

E";(WiX(3+V+&(-/_H,-.(@75:%3(;7(5($+&';2(7A(,fie(5&%(#&3;5$$(#&
;2+(4+;5$(25&'+:3<(=3+(,H,d-e(25&'+:(&5#$3<

4' x 4'

4' x 8

4' x 8

Suggested 2'x4'

Opening Location

4' x 8

4' x 8

4' x 8

4' x 8

2' x 4'

2' x 4'

4' x 4'

Suggested 2'x4'

Opening Location

Important: Before securing the 2x4 floor joists make sure the side walls are plumb. The
building width should be 12'-0" measuring from the outside of the 2x4 tie plates.

Remove Watermark

Wondershare

PDFelement

Summary of Contents for belmont 1216

Page 1: ...Assembly Book Best Barns USA 0 12 3 45 5 3 6789 2 2 6789 2 5 3 2 3 45 5 459 7 678 27 7 85 27 67 3 A 74 B C7 3 DDE F E789 2 G Manufactured by RBS Holdings LLC 205 Arlington Drive Greenville PA 16125 R...

Page 2: ...A Z5 3 7 6 3 N5 S8 7 5 T E5 P B J 77 T 77 A 77 3 37 78 7 5 9 7 459 62773 7 97 7 7 87 5 6 4 85 1 4 7 7 9T Q 5 H E7 A 4 67 3 5 5 G 3 N 4 H E7 A 4 5 3 5 33 3 5 3 5 2 V 65 9 5 N 5 H 178 5 7 74 _3 3 7 A 54...

Page 3: ..._ _ 3 b 3 5 2 A 77 2 K 5 V5 5 3 3856 Ke 585 f E _H A 77 a7 3 7 H e Treated lumber may be thicker than 1 1 2 Take this into account when cutting the length of floor joists Shorten joist measurements i...

Page 4: ...2 7A __e N73 7 2 75 3 7 2 5 65 2 h 45 P3 2 2 5 3 3 765 24 23 1 4 __e Wall Plate 24 144 Wall Plate Pre Cut Wall Studs b 3 5 WiX 3 V 8 H6 5 3 3 2 78 7 74 8 5 3 Z5 3 3 7 5 8 5 3 2 G 3 P 3 W X 7 5 3 7 56...

Page 5: ...4 8 5 3 2 G 3 P 3 Step 3 Assemble Door Header 185 Wall Plate 24 19 3 4 KMe Wall Plates 24 Pre Cut Wall Studs 75 Long 2x8 48 OSB Filler Cut OSB to fit D765 W X 7 KHK 75 3 E 2 3 75 3 7 5 2 7A iMe L33 4...

Page 6: ...5 5 2 7 2 78 8 5 5 7 5 7 2 5 3 G 3 P 3 Install these Studs Centered b 3 5 W0X 3 8 H6 5 3 3 2 5 8 5 3 2 327 33 33 K b 3 5 5 A 2 3 85 7 2 2 3 7A 2 5 85 E 3 53 8 V 7 3 9 3 6 LAP Edge Flush Flush Cut Sid...

Page 7: ...DLN A 32 2 2 3 7 56P 5 327 fd_e 7 7 74 8 5 Z5 3 7 56P 5 5 5 _3 3 0 5 V 5 3 3856 Ke 585 Step 5 Set Walls f b 3 5 WfX 2 47 3 85 3 D53 85 588 7 45 9 fH d e 853 5 A 54 7 6 V A 7 5 85 _ 5 5 56P 5 588 9 3...

Page 8: ...3 5 f E W X 7 7 _3 7 A 3 5 8 5 3 5 3 5 7 A 7 5 56P 5 3 Cut 2x4 12 to Fit 2x4 16 Tie Plate 2x4 16 Tie Plate Step 7 Install Metal 2x4 Joist Hangers b 3 5 W _X A7 _ a7 3 25 3 5 2 2 5 3 3 7 7 2 3 5 3 3 5...

Page 9: ...tant to install sheathing staggered E WiX 3 V _H 75 3 7 5 2 7A fie 5 3 5 2 4 5 25 3 3 H d e 25 5 3 4 x 4 4 x 8 4 x 8 Suggested 2 x4 Opening Location 4 x 8 4 x 8 4 x 8 4 x 8 2 x 4 2 x 4 4 x 4 Suggested...

Page 10: ...2 78 7A S A 5 7 74 7A 3 b 3 5 4 A 32 2 2 3 7 2 3 5 3 3 0 5 V 5 3 3856 e 585 7 3 5 5 4 1x4 Trim Boards f b 3 5 W X 7 i e 7 _ 4 75 3 67 75 3 1 4 327 A 32 2 S 32 5 2 E 75 7 A _ B 8 5 7 3 5 4 75 3 7 2 A 7...

Page 11: ...27 7 2 5 67 6 9 2 7 74 _3 3 5 2 5 4 53 HGe A 74 7 Pre built gable ends highlighted in gray f 1 487 5 9 56P _ 76P3 7 7A A 77 5 7 2 A 54 4 4 3 12 3 76P3 KeH e 7 5 459 25V 5 3 I5P 3 W X 7 7A 2 3 76P3 5 8...

Page 12: ...H6 5 3 7 P A 7 2 3 5 5 3 85 2 5 7 5 7 2 3 b 3 5 A 32 2 7A A 54 5 fd_e 7 2 7 74 _ 8 5 3 0 5 V 5 3 3856 Ke 585 M D765 W X 7 MGHfd_e 7 _3 b 3 5 2 3 Q 5 9 3856 A 74 6 7A 2 5 6 2 7 74 _ 7 2 5 3 3 3 W X 7...

Page 13: ...continued Step 13 Install Gable Overhang _ b 3 5 53 3 85 D765 W X 7 iiHfdKe 7 _ 5A 3 7 5 b 3 5 _3 A 32 2 2 78 7A 5 A 54 3 G 3 P 3 D765 W X 7 fGH d_e 7 _ 5A 3 5 3 5 7 A 32 _3 97 7A 5 30 3 4 Long 2x4 77...

Page 14: ...fdKe 7 _3 5 5 3 2 33 3 B 47V 2 _ 76P3 25 3 6 2 7 74 5 8 5 5 873 7 7 P 8 5A 3 5 D765 5 KH d e 7 _ 76P 2 5 3 5 3 5 5 8 5P 6 5A 3 5 76P 5 8 5P 2 5 77 33 b 3 5 2 W _X A7 0 67447 5 3 f b 3 5 33 3 7 33 3 U...

Page 15: ...0 67447 5 3 7 7 2 3 3 E7 3 5 33 3 7 A 7 7A I5P 3 33 3 5 5 3 5 8 4 bA 6 335 9 385 5 _ 56 733 783 5 56P 7 P 8 8 4 77A 32 5 2 3 3 5 99 Corner Trim 3 8 Gauge Block D765 5 fdKe fe Ke 3 5 76P 856P 2 25 5 5...

Page 16: ..._e _Ke 37AA 85 3 I 53 A 74 6 7A A 3 33 7 7A 37AA 7 5 E 7 37AA 85 7 2 3 2 I5P 3 DLN 3 2 3 6 7AA _ Z5 2 37AA 85 7 2 7A 2 _3 Detail C 7 M b 3 5 A7 37AA 85 3 5 7 2 3 7A 2 6 2 53 37AA 85 A 32 2 2 _ 7 2 5 5...

Page 17: ...48 x 96 48 x 75 51 48 48 x 96 48 48 x 59 1 4 48 x 35 1 4 59 1 4 Step 20 Install 1x6 Fascia on Side Walls 1x6 Fascia Board b 3 5 W X 7 0H0 4 75 3 E 2 53 4 75 A 32 2 2 A 7 37AA 7V 25 5 5 2 56P 5 3 5 5 i...

Page 18: ...32 5 2 5 7 5 58 5 2 78 A7 V 5 7 A V 3 588 b 3 W X 7 8 9H6 83 7 2 77A 32 5 2 562 33 5 2 78 7 3 5 7 8 V 7 3 85 A 32 Step 21B Install Roof Sheathing continued Step 22 Install 2x4s in Front Overhang 5 5 2...

Page 19: ...e 8 4 a54 45 5 7 2 78 7A 2 77 78 A 32 2 2 A 7 5 3 3 0 5 V 5 3 Step 23 Install Door Flashing 3 1 2 x5 Flashing D765 876P 77 7 W X 7 fH d e Me 4 5 A 532 5 5 7 2 7 G 3 b 3 5 5 562 67 7A 2 77 78 12 3 67V...

Page 20: ...33 4 9 2x8 Door Header View From Inside View From Inside Screw Used as Spacer Treated Sill Board Notch in Sill Building Tip run a bead of caulking where flashing treated sill and aluminum sill meet to...

Page 21: ...P 7 3 7 2 3 56P 5 7 Step 26A Install Doors 6 2 77 2 2 3 5 4 75 853 2 _ A 54 see detail below 5 7 2 3 7A 3 2 7 3 7 2 A 3 56P 53 327 7 bA 3 6 335 9 7 5 a 3 2 77 2 2 7 7 7 2 77 65 3 65 5 a 3 D773 36 3 25...

Page 22: ...3 3 6 7 3 Roof Sheathing 1x6 Trim Metal Roof Edge C5 2 7 2 77 J 74 2 3 7A 6 73 7 2 77 3 S 2 2 77 3 5 5 3 77 5 62 5 2 7 74 7A _ A 54 7 7 5 27 2 A 77 A7 2 7 325A 7 78 7 f b 3 5 5 4 5 8 5 7 2 7 56P 7A 7...

Page 23: ...dKe i e U77 c54 fHidKe i H d_e _ 1 56P B7 3 2 56P 3 V U77 D5 62 U77 C5 3 D5 62 J 5 5 U77 Y fe Me Y5 V J 532 _ H d_e N5 C 5 6 3 A7 U77 0 H d e 77 6 3 d 3Q 5 Material Supplied by Local Supplier f0 863 _...

Page 24: ...3 3 _e e _ 77 Y 33 3 MHfd_e _e 77 Y 33 3 MH d e iHfd_e _ c 76P3 KeH Ge 7 588 7 fdKe Y5 76P3 fe Ke j 9 Material Packaged on Pallet G 1 33 B5A 3 _ iiHfdKe i B 76P _ KH d e 0 Y5 SV 25 _ fGHfd_e _ Y5 B5A...

Reviews: