35
1104 Floor Anchor Kit Requirements
An optional floor anchor kit is available for all sizes of
the Axxium Pro UPS. The kit helps to stabilize the UPS
or battery cabinet in the event of accidental bumps or
small floor movements. Any testing to specific seismic
requirements is the responsibility of the customer.
The floor anchor brackets, shipped separately from the
UPS and battery cabinet, should be attached inside the
lower front and rear edges of the cabinet before installing
power modules and battery modules, and before making
connections to the intended power source. The drawing
of a 3-slot cabinet shows how the two brackets are
attached to the cabinet.
Use mounting hardware supplied with the floor anchor
kit to attach the brackets to the UPS or external battery
cabinet, as shown in Figure 11. The customer is responsible
for specifying and supplying floor mounting bolts.
Mounting centers for 5/16-in. (8-mm) floor bolts as shown in Figure 11 are as follows:
“A”:
14.5 in. (368 mm)
“B” (3- and 6-slot):
30.25 in. (768 mm)
(9- and 12-slot):
34.25 in. (870 mm)
1105 Caster Cart Requirements
An optional caster cart (refer to Figure 12) is available for 3-slot and 6-slot cabinets. It increases the mobility of
the UPS, if required.
NOTE: The UPS chassis is heavy. This procedure requires two people to lift and position the chassis into
the caster cart. Lift the cabinet using four lifting straps shipped with the cabinet; do not attempt
to lift the cabinet by the module shelves or other
convenient edges or panels.
The caster cart, shipped separate from the UPS cabinet, must be
placed under the cabinet before installing power modules and
battery modules, and before plugging the UPS into the intended
power outlet.
The cart requires no bolts or other hardware to fasten it to the
UPS cabinet. It is shaped to fit securely under the cabinet,
ensuring proper alignment after placing the cabinet on the cart.
Four foot pads under the cart keep the cart from rolling when it is
in its intended location. Turn each threaded foot to lower it to the
floor. When the foot is tight against the floor, turn the lock nut on
the threaded foot up tight against the bottom of the cart to keep
the foot from rotating.
If leveling of the UPS is required, use the foot pads to raise a side
or corner before locking them with their lock nuts.
B
A
Figure 11. Floor Anchor Brackets
Bolted to UPS Cabinet
Figure 12. 3-slot Cabinet Being Lowered
onto Caster Cart