- 9 -
INSTALL UPPER FLUE MOUNTING BRACKET
1. Drill two
5
⁄
16
” diameter holes where shown. Insert drywall an-
chors into the holes.
2. Center the bracket over the hood location and flush with the
ceiling. Make sure that the slots of the upper flue bracket are
at the bottom. Secure the upper flue bracket to the wall using (2)
#8 x 1½” mounting screws.
3. Tighten the screws completely. Make sure that the bracket is
tight against the wall.
C
L
Flush with
the ceiling
Center of
installation
Upper flue mounting
bracket slots
C
L
7½”
3¾”
1
1
⁄
8
”
Recommended
distance between
screw holes
Ceiling
Ø 5/16” TYP.
Ceiling
Center of installation
Summary of Contents for WBF4I
Page 52: ... 52 99528392B ...