12
1. MACHINE OPERATION
Before installing the tanks, it is necessary to carry out the following operations:
1. Open the two rear latches to the battery compartment and connect the bat-
tery.
2. Close the battery compartment and reconnect the latches.
3. Make sure that the recovery tank is empty.
4. Attach the recovery tank to the handlebar tube and connect the two vacuum
hoses to the lid.
5. Place the solution tank over the base of the machine and connect the quick
connector at the front of the machine.
6. Fill the solution tank as previously described.
7. Lower the squeegee assembly to the floor using the squeegee lift lever on
the rear of the handle tube.
8. Press the main switch (
1
) and check that the green indicator light comes
on.
9. Turn on the vacuum switch (
2
) and the solution control switch (
3
).
10. Pull the operation lever (
4
) to activate the brush and apply solution to the
floor. The machine is now operating.
2. OvERFLOW DEvICE
The machine has a float in the filter basket that stops vacuum airflow when the
recovery tank is full. When this happens the recovery tank must be emptied.
WARNING: Always wear gloves when doing this operation to pro-
tect yourself from contact with hazardous chemicals.
3. FORWARD MOvEMENTS
Forward movement of the machine is assisted by the brush.
WARNING: Always make sure the squeegee is lifted when moving
backwards, even for short distances.
OPERATION
Summary of Contents for Genie B
Page 19: ...19 ...
Page 22: ...22 SQUEEGEE SYSTEM PARTS DIAGRAM 5 18 7 1 8 16 15 11 2 3 6 4 17 17 2 12 9 10 11 12 11 14 13 ...
Page 24: ...24 SQUEEGEE YOKE PARTS DIAGRAM 13 2 5 1 10 7 3 11 14 8 6 12 4 9 ...
Page 32: ...32 ELECTRIC SYSTEM PARTS DIAGRAM 4 7 2 1 6 3 5 ...
Page 38: ...38 ...
Page 39: ...39 ...