Transport, Installation and Connection
4-1
4
Transport, Installation and Connec-
tion
All installation and connection work may be carried out by
qualified and approved specialist staff only !
The legal regulations as well as adjustment instructions of
the plant operator have to be observed!
4.1
Scope of delivery
•
Converter module 5012
•
Operating instructions BA 5012 EN
Refer to the order papers for the exact scope of delivery
and compare with the delivery note.
Checking for completeness
Check the entire delivery for completeness against the ac-
companying delivery note. Please refer to our terms of
sale and delivery otherwise.
Report any damage
After arrival of the device and accessories, notify the ship-
ping agent, the insurance company and BFI Automation
immediately in case of any damage caused by transport
or inadequate packaging.
Take steps to minimise and prevent further damage.
Report the insurance case to the insurance company
without delay and transmit the full claim documents at
once in order to expedite the claims settlement (at the lat-
est in sufficient time before the expiry of any periods of
preclusion and/or limitation relating to the compensation
claims against third parties).
Summary of Contents for 5012
Page 2: ......
Page 11: ...General aspects 1 7 1 8 Declaration of conformity ...
Page 20: ...Safety 2 8 ...
Page 24: ...Technical data 3 4 ...
Page 26: ......
Page 30: ...Transport Installation and Connection 4 4 4 6 2 Network Configuration ...
Page 40: ...Description 5 8 ...
Page 42: ...Commisioning 6 2 ...
Page 44: ...Care and Maintenance 7 2 ...
Page 46: ...Failures 8 2 ...