29
43
44
32
43
43
43
44
20
20
27
75
Reinforcement
Tubes
66
27
64
65
67
Note:
Continue on Next Page.
Note:
• Make sure the cable runs in the grooves of
the pulleys.
• It is strongly recommended that two people
participate in this assembly step.
• Some parts have been removed for Clarity.
Step 12 Assembly List
Item Qty. Description
20
2
BLACK NYLON PULLEY WIDE GROOVE 3/8 X 1 X 3 1/2
27
1
CABLE CDP-300
32
2
HEX HEAD CAP SCREW GR-5 Z/P 3/8-16 X 2 1/2
43
4
FLAT WASHER SAE Z/P 3/8"
44
2
NYLON INSERT THIN PATTERN LOCK NUT Z/P 3/8-16
64
1
CABLE STOPPER SHELL 1 1/2 X 1 3/4
65
1
7/8 RD X 1 5/8 LINK 1/8 CABLE
66
1
OVAL HEAD SCREW Z/P #10-32 X 1 1/8
67
1
SNAP LINK Z/P 8MM X 80MM
75
1
PLASTIC INSERT CAP ELLIPTICAL 2 X 4
Note:
Install
Plastic Insert Cap #75
after
Making sure the
Cable
is running
over the two
Reinforcement Tubes
.