- 45 -
INST
ALLA
TION
INSTALLATION
Fig. 6.3
L
M
N
O
P
Q
R
O
S
N
T
U
• Connect the pipe 11 (Fig. 6.4) from the
pressure relief valve to the safety dis-
charge pipework.
• Fit the condensate drain 9 (Fig. 6.4) in to
the drainage pipework.
• See also section 5.7 in this manual.
Fig. 6.4
11
9
• Fit the filling loop "S" to the pipes d.c.w.
inlet "T" and c.h. return "U". See also sec-
tion "Water circulation (c.h.)" pag. 39 in
this manual.
6.7 Fitting the flue system
For a correct installation of the flue pipe, re-
fer to the sheet provided together with the
pre-selected kit.
The horizontal routes of the flue pipes must
incline about 1.5 degrees (25 mm per me-
ter); therefore the terminal must be higher
than the intake at the boiler.
The single coaxial pipe with the terminal
must be fitted horizontal as the drainpipe is
already angled with the correct incline.
CORRECT system for installing the wall
flue
Fig. 6.5
A+S
ASA
A
= air intake
S
= flue exhaust