background image

--- can be used only for those purposes for

which it has been specially designed;

--- must not be touched by children or by

those unfamiliar with its operation;

--- must not be exposed to weather condi-

tions.

n

During the operation

it is quite normal

that the boiler produces a white plume of

condensation vapour from the flue terminal.

This is due to the high efficiency of the ap-

pliance and may be particularly evident with

low outdoor temperatures.

Safe handling of

appliance

When handling or lifting always use safe tech-

niques

--- keep your back straight, bend your knees, don’t

twist

--- move your feet, avoid bending forwards and

sideways and keep the load as close to your body

as possible.
Where possible transport the boiler using a sack

truck or other suitable trolley.
Always grip the boiler firmly, and before lifting feel

where the weight is concentrated to establish the

centre of gravity, repositioning yourself as necess-

ary.

Safe handling of

substances

These products are manufactured in accordance

with ISO 9000 and do not, and will not, contain any

hazardous materials or substances such as as-

bestos, mercury or C.F.C.’s.

The appliance packaging does not contain any

substances, which may be considered a hazard to

health.

Combustion chamber panels

Material: mineral fibres
Known hazards --- Some people can suffer red-

dening and itching of the skin. Fibre entry into the

eye will cause foreign body irritation, which can

cause severe irritation to people wearing contact

lenses. Irritation to respiratory tract.
Precautions --- Dust goggles will protect eyes.

People with a history of skin complaints may be

particularly susceptible to irritation. High dust le-

vels are only likely to arise following harsh ab-

rasion. In general, normal handling and use will

not present high risk, follow good hygiene prac-

tices, wash hands before, touching eyes, consum-

ing food, drinking or using the toilet.
First aid --- Medical attention must be sought fol-

lowing eye contact or prolonged reddening of the

skin.

Thermostat / Temperature gauge

Description --- Sealed phial and capillary contain-

ing liquid.
Known hazards --- irritating to skin, eyes and

throat. Vapour is harmful. Inflammable --- do not

extinguish with water.
Precautions --- Do not incinerate. Avoid contact

with broken/leaking phials. Do not purposely

puncture.
First aid medical attention must be sought follow-

ing eyes/skin contact, wash with clean water.

Appliance category II

2H3+

Gas G20 20 mbar, G30 29 mbar, G31 37 mbar

Country of destination: United Kingdom (GB) Ireland (IE)

This appliance conforms with the following EEC directive:

D

Gas appliance Directive 90/396/CEE

D

Boiler Efficiency Directive 92/42/CEE

D

Electromagnetic Compatibility Directive 89/336/CEE

D

Low voltage Directive 73/23/CEE

The manufacturer, in the continuous process to improve his products, reserves the right to modify the

data expressed in the present documentation at any time and without prior notice.
The present documentation is an informative support and it cannot be considered as a contract to-

wards third parties.

Summary of Contents for M96A.24SM/B

Page 1: ...Wall hung fan flue room sealed high efficiency gas boiler User manual and Installation instructions GARDA HE MK2 Models M96A 24SM B Combi boiler M96A 28SM B Combi boiler...

Page 2: ...tight is of the correct gauge for the flow to the boiler is fitted with all the safety and control de vices required by the current Regulations n Ensure that the installer has connected the pressure r...

Page 3: ...ich can cause severe irritation to people wearing contact lenses Irritation to respiratory tract Precautions Dust goggles will protect eyes People with a history of skin complaints may be particularly...

Page 4: ...It is also sensible to initially fire and com mission the boiler before connecting any ex ternal controls such as a room thermostat By this method if you have a subsequent prob lem following the addi...

Page 5: ...25 6 3 Installing the bracket 25 6 4 Overall dimensions 26 6 5 Joints 26 6 6 Mounting the boiler 26 6 7 Fitting the flue system 27 6 8 Choice of flue 27 6 9 Electrical connections 30 6 10 External fr...

Page 6: ...reset button 8 Function selector and c h temp control knob 9 D h w temperature control knob 10 Appliance operation lights 1 3 Isolation valves 14 12 16 13 15 11 Fig 1 2 bottom view of the boiler 11 C...

Page 7: ...he above table a fault may be indicated Reference should be made to the following table In this case switch off the boiler as described in section 2 6 on page 6 and call a competent and re sponsible S...

Page 8: ...ro cedure you are advised to contact your In staller or an Approved Engineer This appliance is provided with a built in anti freeze system that operates the boiler when the temperature is below 5 C Th...

Page 9: ...le from a minimum of about 40 C to a maximum of about 85 C Fig 2 6 by turning the function se lector 8 Adjustment of c h output on the boiler is auto matic The greatest output pre set in the factory c...

Page 10: ...d water In this way the automatic control facilities will be fully exploited Moreover where the amount of limescale present in the water may be particularly great not exceed ing the position in Fig 2...

Page 11: ...position the time display G is flashing Set the mode selector switch A to the position and press the buttons D or E until the current time appears in the display G The clock starts by moving the swit...

Page 12: ...different position Manual operation The operation of the time switch can be forced on or off constantly or for a timed period To force constantly on or off the timer operation set the mode selector sw...

Page 13: ...rresponding to 14 on off sequences Press repeatedly the button A until the display shows the symbol C1 Fig 2 21 The symbols shown in Fig 2 21 appears in the display A Fig 2 21 Press the buttons D or E...

Page 14: ...A Fig 2 24 The operation can be switched permanently on or off by pressing the button F and leaving the dis play shows the symbol TIMER To force a timed delay on or off operation press repeatedly the...

Page 15: ...it is advisable to arrange maintenance and cleaning by an Authorised Service Centre En gineer at least once a year During the service the most important compo nents of the boiler will be inspected an...

Page 16: ...er comes out of the pressure relief valve Check on the temperature and pressure gauge 4 on page 2 that the pressure in the central heating circuit is not close to 3 bars In this case tempera ture rise...

Page 17: ...lve 25 Condensate trap 26 Automatic air purger valve 27 Pump vent plug 28 Pump 29 C h pressure relief valve 30 D h w flow switch 31 Modulation gas valve 32 Modulation operator 33 Gas valve outlet pres...

Page 18: ...Technical information 14 4 2 Main diagram 46 19 50 49 38 43 41 33 28 29 30 31 34 26 36 37 45 47 12 13 16 14 44 17 39 23 35 15 32 22 40 24 48 21 25 11 20 Fig 4 2 INSTALLATION...

Page 19: ...or sys tem component cocks the by pass valve ensur es a minimum flow of water through the primary heat exchanger 4 4 Expansion vessel Note this boiler is designed for operation only in a sealed centr...

Page 20: ...r Maximum temperature C 55 Minimum temperature C 35 Maximum pressure kPa bar 1 000 10 Minimum pressure kPa bar 30 0 3 Flow rate minimum l min 2 5 30 rise C l min 11 6 35 rise C l min 10 0 40 rise C l...

Page 21: ...mption W 140 Protection degree IPX4D External fuse rating A 3 Internal fuse rating A F1 F2 3 15 AF Flue design Type C12 C32 C42 C52 C82 Flue pipe diameter Coaxial mm 60 100 Twin split pipes mm 80 Roof...

Page 22: ...r Maximum temperature C 55 Minimum temperature C 35 Maximum pressure kPa bar 1 000 10 Minimum pressure kPa bar 30 0 3 Flow rate minimum l min 2 5 30 rise C l min 13 6 35 rise C l min 11 6 40 rise C l...

Page 23: ...mption W 150 Protection degree IPX4D External fuse rating A 3 Internal fuse rating A F1 F2 3 15 AF Flue design Type C12 C32 C42 C52 C82 Flue pipe diameter Coaxial mm 60 100 Twin split pipes mm 80 Roof...

Page 24: ...is drawn tothe requirementsof the current I E E Wir ing Regulations and in Scotland the electrical provisions of the Building Regulations applicable in Scotland with respect to the installation of the...

Page 25: ...in use at the same time Pipework must be of adequate size Pipes of a smaller size than the boiler inlet connection should not be used Installation pipes should be fitted in accordance with BS 6891 and...

Page 26: ...ally to air release points and water flows naturally to drain taps The appliance has a built in automatic air release valve it should be ensured as far as possible that the appliance heat exchanger is...

Page 27: ...The installer should ensure that no leaks exist either inside the boiler or on the system as fre quent filling of the system could cause premature scaling of the heat exchanger 5 9 Domestic water The...

Page 28: ...overvoltage cat egory III Alternatively it can be used a 3A fused three pin plug and unswitched shuttered socket outlet both complying with BS 1363 The point of connection to the electricity supply m...

Page 29: ...with during installation To allow maintenance procedures it is necess ary to leave the minimum gaps indicated in Fig 6 1 25 50 250 200 Fig 6 1 all dimensions in mm When installing the boiler in a cup...

Page 30: ...boiler 1 Take the protective caps off the boiler pipe work 2 Thoroughly clean the connections 3 Mount the boiler on its bracket 4 Fix the c h valves A and gas cock B to the boiler using the gaskets F...

Page 31: ...with the boiler is fitted to the boiler Fig 6 5 6 8 Choice of flue The following flue kits are available for connecting to the boiler Standard horizontal flue kit Fig 6 6A Co axial 60 100mm nominal l...

Page 32: ...here the boiler is installed in a location remote to an outside wall These kits allow for separation of the air supply pipe from the pipe that discharges the exhaust gasses Consequently it is possible...

Page 33: ...ll maximum permissible length Optional 45 and 90 elbowscan be used tooffset the flue route Each additional elbow reduces the overall accept able length of the flue system as follows 45 reduce length b...

Page 34: ...J K I Fig 6 13 3 Loosen the screws K 4 Remove the side panels or move the lower part of the side panels as indicated in Fig 6 14 and pull the control panel When completely pulled out the panel can ro...

Page 35: ...1 and 3 as shown in Fig 6 17 Do not connect live wires to terminals to which the room thermostat must be con nected Power supply terminal block External controls terminal block T Room thermostat 1 2...

Page 36: ...de scribed in BS 6891 For Ireland IE refer to I S 813 2002 2 Open the gas cock 14 Fig 7 1 on the appliance and check the gas connector on the appliance for leaks Open position 14 13 Fig 7 1 7 3 Fillin...

Page 37: ...fter 3 4 minutes has elapsed the boiler will then re ignite and operate perfectly normally The ignition delay cycle does not prevent normal operation of the boiler to pro vide d h w If externalcontrol...

Page 38: ...A fullexplanation of the gas pressure adjustment procedure is given in the Gas Valve section of the service manual If maximum and or minimum gas pressures are adjusted then the ignition gas pressure...

Page 39: ...gures 7 11 Checking the condensate drain pipe Check the soundness and integrity of the conden sate drain pipe Verify the cleanness and correct filling of the con densate traps 7 12 Instructing the use...

Page 40: ...r 40 on page 13 See section Ignition and detection electrodesin the service manualfor detailed in structions 5 Carry out the conversion for the type of gas re placing the burner injectors correctly 6...

Page 41: ...neously 15 Open the gas cock 14 in Fig 8 7 Open position 14 Fig 8 7 16 To reset the boiler to the normal operation turn it ON by the function selector 8 on the desired operation and checking the ignit...

Page 42: ...or cleaning mainten ance opening or dismantling boiler panels 9 2 Dismantling the external panels Front panel 1 Loosen the three screws A Fig 9 1 2 Lift and remove the panel A Sampling points Air Flue...

Page 43: ...Cleaning the burner The sloping and multi gas type burner 40 on page 13 does not need special maintenance but it is sufficient to dust it with a bristle paintbrush To reach the burner 1 Take off the...

Page 44: ......

Page 45: ......

Page 46: ......

Page 47: ......

Page 48: ...1578 0 4908 48A5 UK Biasi UK Ltd Newman Park Western Way Wednesbury WS10 7BJ Sales Tel No 0121 506 1340 Sales Fax No 0121 506 1360 Service Tel No 0121 506 1350 Service Fax No 0121 506 1370 www biasi c...

Reviews: