background image

 

2.  Instruction for use 

 

2. 

Инструкция

 

по

 

эксплуатации

 

2.1. Warnings 

 

2.1 

Предупреждения

 

In order to guarantee safety and correct 
operation, it is essential that all the tests are 
carried out by a competent and responsible 
service engineer before lighting up the boiler. 

 

Чтобы

 

гарантировать

 

безопасную

 

и

 

правильную

 

работу

 

котла

перед

 

его

 

запуском

 

необходимо

чтобы

 

все

 

тесты

 

были

 

проведены

 

компетентным

 

инженером

 

сервисного

 

центра

The tests are described in the installation 
instructions in section 6 commissioning. 

 

Порядок

 

проведения

 

тестов

 

описан

 

в

 

разделе

 6 

инструкции

 

по

 

установке

Ensure that the C.h. circuit is regularly filled 
with water (even if the boiler is only used for 
D.h.w. supply) checking that the pressure 
indicated on the temperature and pressure 
gauge 4 is not lower than that shown in Fig. 
2.2. 

 

Удостоверьтесь

что

 

контур

 

системы

 

отопления

 

полностью

 

заполнен

 

водой

 

(

даже

 

если

 

котел

 

используется

 

только

 

на

 

приготовление

 

гоячей

 

воды

), 

проверьте

чтобы

 

давление

 

на

 

термоманометре

 (4) 

было

 

не

 

ниже

чем

 

давление

указанное

 

на

 

рисунке

 2.2. 

If the pressure reading on the pressure gauge 
is below that shown in Fig. 2.2, then the 
system will require topping up. A filling loop is 
normally provided by the installer for this 
purpose. 

 

Если

 

давление

 

на

 

датчике

 

ниже

чем

 

указанное

 

на

 

рисунке

 2.2, 

необходимо

 

произвести

 

дозаполнение

 

системы

Как

 

правило

эта

 

работа

 

выполняется

 

монтажниками

If you are in any doubt regarding this 
procedure you are advised to contact your 
Installer or an Approved Engineer. 

 

Если

 

у

 

Вас

 

возникли

 

какие

-

либо

 

сомнения

 

относительно

 

этой

 

процедуры

мы

 

рекомендуем

 

обратиться

 

к

 

монтажнику

 

или

 

специалисту

 

Авторизированного

 

сервисного

 

центра

This appliance is provided with a built in anti-
freeze system that operates the boiler when 
the temperature is below 0 °C 
Therefore, when the boiler is not lit or used in 
cold weather, with consequent risk of freezing  

 

Это

 

устройство

 

оборудовано

 

системой

 

защиты

 

от

 

замерзания

которая

 

включается

если

 

температура

 

в

 

котле

 

опускается

 

ниже

 0 

градусов

Поэтому

когда

 

котел

 

не

 

используется

или

 

используется

 

в

 

холодную

 

погоду

,  

do not switch off the boiler at the fused 
spur isolation switch or close the gas inlet 
cock. 

 

не

 

следует

 

отключать

 

его

 

от

 

питания

 

или

 

перекрывать

 

газовый

 

кран

во

  

избежании

 

размораживания

 

системы

When you expect not to use the boiler for a 
long period follow the instructions given in 
section 3.2. 

 

Если

 

Вы

 

предполагаете

 

не

 

использовать

 

котел

 

в

 

течение

 

долгого

 

времени

следуйте

 

инструкциям

приведенным

 

в

 

разделе

 3.2. 

  

Commissioning 

  

37 

 

 

Fig. 6.9 

 

Fig. 6.10 

 

 

Fig. 6.11 

 

 

6.8.  Checking the ignition device 

 

6.8 

Проверка

 

устройства

 

розжига

 

With the burner on high flame close the gas 
cock. 

 

При

 

большом

 

пламени

 

горелки

 

закройте

 

газовый

 

кран

About 10 seconds after, the lock-out signal 
lamp 5 ( Fig. 1.3 ) must appear. 

 

По

 

истечении

 10 

сек

должен

 

появиться

 

сигнал

 

блокировки

 - 

индикатор

 5 (

Рис

. 1.3). 

To reset the boiler press and release the 
boiler reset button 6 (Fig. 1.3 ). 

 

Чтобы

 

перезапустить

 

котел

 

нажмите

 

кнопку

 6 (

Рис

. 1.3 ) 

Summary of Contents for PARVA CONTROL M90.24AV

Page 1: ...1796211072 17962 1107 2 4606 52A5 PARVA CONTROL MODEL M90 24AV USER MANUAL AND INSTALLATION INSTRUCTIONS...

Page 2: ...erous to obstruct even partially the air intakes used to aerate the room where the boiler is installed to use extractor fans fire places and the like in the same room at the same time as the boiler to...

Page 3: ...the gas cocks get the assistance of a qualified person Do not touch the appliance with parts of the body that are wet or damp and or bare feet In case of structural work or maintenance near the exhaus...

Page 4: ...ng the addition of an external control you can eliminate the boiler from your fault analysis Do not forget to range rate the boiler to suit the system requirements This procedure is covered in the com...

Page 5: ...e boiler to follow the timed settings Some products incorporate an anti cycling time delay It is normal when first switching the boiler on for the boiler to operate on heating for a few seconds then s...

Page 6: ...1 Warnings 39 7 2 Procedures 39 8 Maintenance 8 1 Warnings 41 8 2 Dismanting the external panels 41 8 3 Emptying the ch system 42 8 4 Cleaning the primary heat exchanger 42 8 5 Checking the pressurisa...

Page 7: ...e left hand side panel adjacent to the data badge the self adhesive label included with the conversion kit indicating the type of gas and the gas pressures to which the appliance has been set 11 12 Re...

Page 8: ...tructions relating to the procedures for adapting the boiler to the type of gas available and subsequent calibration described below are presented in sections 6 5 and 6 6 6 5 6 6 7 2 Procedures 7 2 1...

Page 9: ...ur Fill in the details required on the Boiler Guarantee Certificate and hand to the User advising them to return the correct section for boiler Guarantee registration Finally advise the User that for...

Page 10: ...s normally provided by the installer for this purpose 2 2 If you are in any doubt regarding this procedure you are advised to contact your Installer or an Approved Engineer This appliance is provided...

Page 11: ...ment potentiometer marked RISC Fig 6 8 Rotating the potentiometer anti clockwise reduces the maximum supply current to the gas modulator device and thus reduces the gas pressure to the burner RISC 6 8...

Page 12: ...e operation light 9 will flash every 2 seconds operating boiler 4 7 2 5 9 2 Commissioning 35 6 6 Adjusting the burner ignition 6 6 1 Turn off the boiler by means of the fused spur isolation switch pro...

Page 13: ...ment will be necessary A full explanation of the gas pressure adjustment procedure is given in the Gas Valve section of the service manual If maximum and or minimum gas pressures are adjusted then the...

Page 14: ...iance operation light 9 will flash every 4 seconds 7 2 9 9 4 Commissioning 33 5 Set the d h w and c h temperature control knobs to their maximum position 5 6 Switch on the boiler and if external contr...

Page 15: ...panel of the case see section 8 2 in this manual 1 8 2 2 Open the gas valve inlet pressure test point 36 in Fig 6 5 at the valve input connect a suitable pressure gauge check the gas pressure of the s...

Page 16: ...ll turn and leave open permanently 3 21 6 2 1 4 Open the C h circuit filling valve 12 in Fig 6 1 and fill the C h circuit see section 2 2 4 12 6 1 2 2 5 Open each radiator air release tap starting wit...

Page 17: ...be inspected and cleaned This service can be part of a maintenance contract In particular you are advised to have the following checks carried out primary heat exchanger domestic hot water storage tan...

Page 18: ...ter comes out of the pressure relief valve Check that the C h circuit filling valve is closed as described in the section 2 2 of this manual 2 2 Check on the temperature and pressure gauge 4 on sectio...

Page 19: ...ting it upwards 5 14 Connect the two temperature probe wires between D h w storage tank temp probe terminals Fig 5 15 5 15 Insert D h w storage tank temp probe in the longest probe sheath Fig 5 16 5 1...

Page 20: ...on switch Fig 5 11 T 1 2 L N 3 Room thermostat Power supply terminal block External controls terminal block Fig 5 12 5 Connect the electrical supply flexible cord coming from the fused spur isolation...

Page 21: ...to facilitate the operations on the internal parts 3 5 9 45 4 Loosen the screws J and remove the service panel Fig 5 10 4 J 5 10 For the electrical connection to the boiler use electric wires which co...

Page 22: ...C h temp probe NTC Primary circuit flow switch Three way diverter valve D h w storage tank temp probe NTC NTC Pump Gas valve Installation 25 5 7 Installing the D h w storage tank 5 7 D h w storage tan...

Page 23: ...l information 17 4 4 Technical Data mod M90 24AV 4 4 Nominal heat input kW 26 6 Minimum heat input kW 11 0 Maximum useful output kW 24 0 Minimum useful output kW 9 3 Central heating Temp regulation ra...

Page 24: ...ney working at the nominal heat input 1 Installation 23 5 3 Installing the bracket 5 3 Precautions Utilise the paper template supplied with the boiler to determine the fixing position for the bracket...

Page 25: ...by promoting formation of a protective skin on metal surfaces and neutralising gases present in the water Technical information 19 4 5 Hydraulic specifications 4 5 0 00 0 10 0 20 0 30 0 40 0 50 0 2 0...

Page 26: ...d only in an adequately ventilated room in conformity with the standards A minimum air flow rate of 2 m3 h per kW of max heat input must be ensured 2m3 For LPG the appliance must also conform with the...

Reviews: