background image

9

C

omp

on

en

ts

to

ch

ec

k

S

ec

tio

n

of

the

m

anual

!

(n

ot

e

ref

.i

n

brac

ket

s)

---

---

--- (8)
--- (7)

20.1

19.2

18.2

17.2

16

15.2

14.5

12.2

11.4

10.9

9.2

8.2
7

--- (4)

21.1
--- (3)
--- (2)

--- (1)

Loc

k---

out

sig

nal

lam

pre

d

Pre

ssure

gau

ge

Safe

tyv

alv

e

Exp

ans

ion

vesse

l

Inje

ctor

s

Flue

ther

mostat

Safe

tyth

ermosta

t

Dete

ctione

lectr

ode

Ign

ition

elec

trod

e

Air

pre

ssure

switch

Fan

and

vent

urid

evi

ce

By-

- -p

ass

val

ve

D.h.

w.t

em

p.p

rob

e

Mai

nc

irc

uitt

em

p.pr

obe

D.h.

w.f

ilte

r

Main

circu

itf

low

sw

itch

Gas

val

ve(m

odul

atin

go

perat

or)

Gas

val

ve(o

n---

off

ope

rators

)

Boil

erse

ttings

Ele

ctro

nic

p.c.

b.

Fus

es

(E

lec

tro

nic

p.c.

b.)

D.h.

w.f

low

sw

itc

h

Dive

rter

valve

Pump

D.h.

w.he

ate

xch

anger

D.h.

w.c

irc

uit

C.h.

circ

uit

Conde

nsa

te

drai

np

ipe

and

trap

Flue

pipe

s

Gas

suppl

yli

ne

Pow

ers

upply

lin

e

De

fe

ct

#

Th

e

boil

er

does

not

su

pp

ly

d.h

.w

.

(col

d

w

at

er

from

th

e

ta

p).

R

eg

ul

ar

op

er

ation

in

c/

h

m

od

e

ev

en

du

rin

g

a

drawi

ng

of

fd

.h

.w

.

J

J

J

O

n

c/

h

m

od

e

the

te

m

pe

rat

ur

e

of

the

m

ai

n

ci

rc

ui

tr

eac

hes

75

°

Ca

nd

th

e

c/

h

sy

st

em

do

es

no

th

eat

.

Th

e

bo

ile

ro

pe

rat

es

co

rrec

tly

on

d.

h.

w

.m

ode

.

J

J

In

co

rrec

tm

od

ul

at

io

n

J

J

J

N

oisy

bolie

r

J

J

Th

e

bo

ile

ro

pe

rat

es

co

rrec

tly

bu

tt

he

gas

pr

es

su

re

to

th

e

bur

ne

rr

em

ai

ns

at

min

imu

m.

J

J

F

Po

or

d.

h.

w

.t

em

pe

rat

ur

e

J

J

J

J

J

(9

)

OFF

Lo

w

d.h

.w

.f

lo

w

rat

e

J

J

J

---

W

ate

rl

ea

ks

from

th

e

sa

fe

ty

va

lv

e

du

r-

in

g

op

er

ation

on

c/

h

J

J

J

J

---

W

ate

rl

ea

ks

from

th

e

sa

fe

ty

va

lv

e

wh

en

th

e

boi

le

ri

s

of

f.

J

J

J

No

te

U

se

fu

lin

fo

rm

at

io

n

ca

n

be

ob

ta

in

ed

al

so

fr

om

the

op

tic

al

in

dic

at

io

n

give

n

by

the

ap

pl

ia

nc

e

op

er

-

at

io

n

lig

ht

s

(see

sec

tio

n

10.4)

.

1

C

he

ck

fo

r230V~

between

lin

e

(L

)a

nd

ne

ut

ra

l(

N

)

Ve

rif

y

th

e

in

te

gr

ity

of

su

pp

ly

ca

bl

e,

pl

ug

an

d

ex

te

rn

al

fu

se

s.

C

he

ck

the

po

la

rit

y

of

line

and

ne

ut

ral

co

nne

ct

io

n

2

Ve

rif

y

th

e

tig

htn

es

s

of

th

e

ga

s

su

pp

ly

pip

e,

th

e

position

of

stop

val

ve

s.

C

he

ck

the

gas

pr

es

su

re

at

th

e

inl

et

te

st

po

in

to

ft

he

gas

val

ve

(s

ee

se

ct

.11.3)

wi

th

th

e

boi

le

ra

tr

es

ta

nd

du

rin

g

op

erat

io

n

an

d

co

mp

ar

e

it

w

ith

th

e

va

lu

es

gi

ve

n

on

th

e

in

st

alla

tio

n

bo

ok

le

t.

3

C

he

ck

fo

rs

oundne

ss

and

abs

en

ce

of

ob

st

ru

ct

io

ns

.V

er

ify

that

th

e

flu

e

te

rmin

al

is

co

rr

ect

ly

in

st

alle

d

(se

e

cle

ar

an

ce

s)

an

d

en

-

su

re

th

at

ex

haus

tg

as

is

no

ts

uc

ke

d

bac

k

by

the

bo

ile

r.

4

C

he

ck

fo

rs

oundne

ss

of

th

e

ci

rc

ui

tand

ve

rif

y

its

co

rr

ec

tfi

lli

ng

(s

ee

al

so

in

st

alla

tio

n

ma

nu

al)

.

5

A

ja

m

m

ed

by

---

pa

ss

co

ul

d

ca

us

e

th

e

ov

er

---

he

at

in

g

of

th

e

m

ai

n

ci

rc

ui

ta

nd

th

e

int

er

ve

nt

io

n

of

the

sa

fe

ty

th

er

m

os

tat

.

6C

he

ck

th

e

min

imu

m

gas

pr

es

sur

e

at

the

ou

tle

tt

es

tpo

in

to

ft

he

ga

s

val

ve

(s

ee

se

ct

.1

1.

3)

and

co

m

pa

re

it

wi

th

th

e

val

ue

gi

ven

on

th

e

in

sta

lla

tion

book

le

t.

7

Ve

rif

y

the

cl

ea

nne

ss

of

in

je

ct

or

s.

8

C

he

ck

th

e

pr

essu

riz

ation

of

th

e

ex

pa

nsion

ve

sse

l.

R

ef

er

to

th

e

in

st

al

la

tion

ma

nu

al

for

pr

op

er

va

lu

es

.

9

d.

h.

w

.p

re

ssu

re

to

o

hig

h

or

flo

w

ra

te

to

o

hi

gh

.I

fn

ec

essa

ry

in

-

se

rt

a

flo

w

ra

te

lim

iter

(14.6)

Summary of Contents for Parva HE M96.24SM/P

Page 1: ...oom sealed high efficiency gas boiler Service manual Models G C Appl No M96 24SM P 47 583 08 M96 28SM P 47 583 09 M96 32SM P 47 583 10 M96 28SR P 41 583 05 M96 32SR P 41 583 06 Leave this manual adjac...

Page 2: ...l of the electronic control p c b 21 10 11 Thermal control in the mode 23 10 12 Thermal control in the mode 23 10 13 Ignition and control sequence 24 11 Modulating gas valve 25 11 1 Function 25 11 2 N...

Page 3: ...lease Pump D h w temp probe D h w heat exchanger Expansion vessel Detection electrode valve Condensing Diverter valve Air pressure switch Main circuit Flue thermostat heat exchanger Condensate trap fl...

Page 4: ...A Fig 2 lift the panel and remove it A Fig 2 To remove the side panels loosen the screws B and C Fig 3 bring the base of the panels away from the boiler and lift them freeing them from the top hooks B...

Page 5: ...mber For this purpose remove the front and side panels of the case remove the screws G as indicated in Fig 6 and remove the lid 2 5 Emptying the primary circuit 1 Close the c h circuit flow and return...

Page 6: ...cuit flow switch Air pressure switch D h w flow switch C h temperature probe NTC Modulating gas valve Safety thermostat Flue temperature D h w temperature probe NTC bn brown bu blue bk black wh white...

Page 7: ...l block Pump Fan M Primary circuit flow switch Air pressure switch C h temperature probe NTC Modulating gas valve Safety thermostat Flue temperature bn brown bu blue bk black wh white rd red gy grey g...

Page 8: ...L Transformer ACTIVE CIRCUIT INACTIVE CIRCUIT L LINE N NEUTRAL N Electronic control p c b low voltage section J1 2 J3 3 J3 5 J3 4 J3 2 J3 1 J2 4 J2 5 Three way diverter valve Pump Full sequence igniti...

Page 9: ...5 SB1 X5 K2 X3 X2 X4 Electrical voltages with burner on during c h or d h w operation only during c h operation only during d h w operation Supply network 230 230 0 230 230 0 Pump 3 way 230 Modulating...

Page 10: ...ressing the reset push button the boiler turns on and operates cor rectly J J 6 J J J By pressing the reset push button the boiler starts the ignition cycle The burner doesn t light on the igni tion s...

Page 11: ...g operation on c h J J J J Water leaks from the safety valve when the boiler is off J J J Note Useful information can be obtained also from the optical indication given by the appliance oper ation lig...

Page 12: ...it from the wiring E M C B F C D G I J N K L H Fig 11 7 Loosen the connection K and move the pipe L downwards freeing it from the connection of the primary het exchanger 8 Remove the clip M 9 Move th...

Page 13: ...NTC F see section 20 3 5 Completely loosen the connection G and slightly move the pipe H upwards 6 Remove the clip I and move the pipe J down wards freeing it from the connection then turn it towards...

Page 14: ...re removing any covering or component 1 Remove the front and right hand side panels of the case 2 Empty the primary circuit and the d h w circuit of the boiler 3 Completely unscrew the two Allen key s...

Page 15: ...lug from the pump Start the boiler and with a screwdriver turn the rotor in the direc tion of the arrow If there is a defect in starting the rotor will begin to turn normally only starting it manually...

Page 16: ...B brass spindle when the boiler operates in c h mode In both figures the relationship between the position of the actuator and the resistance of the motor windings the motor must be disconnected from...

Page 17: ...t both c h and d h w temperature probe respectively H and I 6 Unscrew the connector J the c h flow connector and the d h w outlet connector F G J H I Fig 25 7 Remove the d h w heat exchanger see secti...

Page 18: ...e flame during the entire period in which it is activated supplies the fan and checks its functioning by means of the signal coming from the air pressure switch The Electronic control ignition p c b h...

Page 19: ...user setting the desired temperature with the con trol panel knobs operates the variable elements 8 and 9 in Fig 29 of the electronic control p c b If the power requested is lower than 40 of the maxi...

Page 20: ...1 second ON 1 second OFF Boiler ON condition function control in or position With the boiler switched ON or all the lamps 10 in Fig 29 are activated The following table gives the relationship between...

Page 21: ...nding to the desidered delay By turning the knob B the lock out signal lamp D blinks quickly 2 per seconds indicating that the setting has changed and must be memo rised Delay minutes Setting No B 0 1...

Page 22: ...he setting has changed 11 To change the setting turn the knob B on a posi tion corresponding to the boiler model Fig 41 12 To memorize the setting keep pressed the reset button C for about 5 seconds u...

Page 23: ...boiler on and off by means of the function switch the device must not unlock and the burner must not turn on n Fan functioning device With the boiler operating and the burner on open the negative pres...

Page 24: ...h w tem perature adjustment knobs can move freely for the complete range If not remove the spindle again as described at step 3 turn the knob half a turn and re insert the spindle 11 Operate the boil...

Page 25: ...est for heat from room thermostat Starts the circulator Operates motorised valve Supplies the ignition device NO Circulator off Operates motorised valve Ignition device off YES YES Fig 50 10 12 Therma...

Page 26: ...h at work NO YES starts ignition discharges opens gas valve beginning of ignition period flame presence end of ignition period NO NO YES closes gas valve stops fan interrupts ignition discharges memor...

Page 27: ...gas pressure adjustment 3 Modulation operator s electric connectors 4 On off operators electric connector 5 On off operators 6 Gas valve inlet pressure test point 7 Gas valve outlet pressure test poi...

Page 28: ...ct the connectors D Fig 57 from the modulating operator and measure the electrical resistance of the coil Its electrical resistance value must be approx 114 n Check the on off operators coils 1 Remove...

Page 29: ...the switch box verify the position of the shaft B referring to Fig 59 B Boiler OFF Boiler ON Fig 59 n Electrical check It is possible to verify the general operation of the switch by measuring the ele...

Page 30: ...rect value 13 3 Removal of the expansion vessel If there is at least 400 mm clearance above the boiler and the rear exit flue can be easily removed the expan sion vessel can be changed without removin...

Page 31: ...een the leads of the sensor Without water being drawn the contact must be open By opening a hot water tap the contact must be close electrical resistance zero 14 4 Removal of the sensor Warning isolat...

Page 32: ...a flow limiter The following sizes areavail able Nominal flow rate litres min Colour 10 Blue 12 Red 14 Pink To install the flow limiter 1 Remove the flow switch group as explained in the section 14 5...

Page 33: ...low c h return d h w inlet d h w outlet A B Fig 70 15 2 Checks n Temperature resistance relationship Warning isolate the boiler from the mains electricity supply before removing any covering or compon...

Page 34: ...e is fitted on the rear side of the div erter group A Fig 72 16 2 Removal Warning isolate the boiler from the mains electricity supply before removing any covering or component 1 Remove all the case p...

Page 35: ...has to be about 43 M96 24SM 25 M96 28SM M96 32SM at ambient temperature D A C Fig 75 n Check of the Air pressure switch operation Warning isolate the boiler from the mains electricity supply before r...

Page 36: ...switch 4 Unscrew the screw F and remove the bracket G Fig 78 D E C F G Fig 78 5 Remove the Fan by sliding it towards left se the arrow in Fig 78 6 Assemble the fan carrying out the removal oper ations...

Page 37: ...ly before removing any covering or component 1 Remove all the case panels and the sealed chamber lid 2 Disconnect the wires from the Air pressure switch 3 Remove the pipe from the Air pressure switch...

Page 38: ...e removing any covering or component 1 Remove all the case panels the sealed chamber lid and the combustion chamber lid 2 Check for the integrity of the insulation of wires which connect the electrode...

Page 39: ...ccur Warning isolate the boiler from the mains electricity supply before removing any covering or component n Electrical function 1 Remove all the case panels and the lid of the sealed chamber 2 Remov...

Page 40: ...egral parts of the boiler If not the electronic control p c b attempts to light the burner and at the end locks the boiler and lights the lock out signal lamp B Fig 88 20 2 Checks n Overheat temperatu...

Page 41: ...lec trode Fig 90 C B Fig 90 If the drain pipe is plugged or in any case in which the condensate isn t correctly evacuated the condensate level in the trap rises putting in contact the electrodes thus...

Page 42: ...25 mbar mod M96 28SM M96 28SR 1 BI1376 104 Yamatake Honeywell C6065 SIT 380 alternative 8 Safety valve 1 BI1181 100 9 E83 178 Combustion chamber side panels 2 BI1326 100 10 E83 180 Combustion chamber...

Page 43: ...Short spare parts list 41 26 E83 145 Temperature pressure gauge 1 BI1475 108 IMIT 27 H07 112 Recuperator 1 BI1262 122 P5 1 2 6 4 5 7 3 8 14 17 12 19 21 22 23 25 26 13 15 24 16 18 9 10 11 9 20 27...

Page 44: ...17962 1402 0 2407 44A4 UK Biasi UK Ltd Newman Park Western Way Wednesbury WS10 7BJ Sales Tel No 0121 506 1340 Sales Fax No 0121 506 1360 Service Tel No 0121 506 1350 Service Fax No 0121 506 1370 www...

Reviews: