background image

system and/or a hot water supply system,

compatible with its performance and output;

--- can be used only for those purposes for

which it has been specially designed;

--- must not be touched by children or by

those unfamiliar with its operation;

--- must not be exposed to weather condi-

tions.

n

During the operation

it is quite normal

that the boiler produces a white plume of

condensation vapour from the flue terminal.

This is due to the high efficiency of the ap-

pliance and may be particularly evident with

low outdoor temperatures.

Safe handling of

appliance

When handling or lifting always use safe tech-

niques

--- keep your back straight, bend your knees, don’t

twist

--- move your feet, avoid bending forwards and

sideways and keep the load as close to your body

as possible.
Where possible transport the boiler using a sack

truck or other suitable trolley.
Always grip the boiler firmly, and before lifting feel

where the weight is concentrated to establish the

centre of gravity, repositioning yourself as necess-

ary.

Safe handling of

substances

These products are manufactured in accordance

with ISO 9000 and do not, and will not, contain any

hazardous materials or substances such as as-

bestos, mercury or C.F.C.’s.

The appliance packaging does not contain any

substances, which may be considered a hazard to

health.

Combustion chamber panels

Material: mineral fibres
Known hazards --- Some people can suffer red-

dening and itching of the skin. Fibre entry into the

eye will cause foreign body irritation, which can

cause severe irritation to people wearing contact

lenses. Irritation to respiratory tract.
Precautions --- Dust goggles will protect eyes.

People with a history of skin complaints may be

particularly susceptible to irritation. High dust le-

vels are only likely to arise following harsh ab-

rasion. In general, normal handling and use will

not present high risk, follow good hygiene prac-

tices, wash hands before, touching eyes, consum-

ing food, drinking or using the toilet.
First aid --- Medical attention must be sought fol-

lowing eye contact or prolonged reddening of the

skin.

Thermostat / Temperature gauge

Description --- Sealed phial and capillary contain-

ing liquid.
Known hazards --- irritating to skin, eyes and

throat. Vapour is harmful. Inflammable --- do not

extinguish with water.
Precautions --- Do not incinerate. Avoid contact

with broken/leaking phials. Do not purposely

puncture.
First aid medical attention must be sought follow-

ing eyes/skin contact, wash with clean water.

Appliance category II

2H3+

Gas G20 20 mbar, G30 29 mbar, G31 37 mbar

Country of destination: United Kingdom (GB) Ireland (IE)

This appliance conforms with the following EEC directive:

D

Gas appliance Directive 90/396/CEE

D

Boiler Efficiency Directive 92/42/CEE

D

Electromagnetic Compatibility Directive 89/336/CEE

D

Low voltage Directive 73/23/CEE

The manufacturer, in the continuous process to improve his products, reserves the right to modify the

data expressed in the present documentation at any time and without prior notice.
The present documentation is an informative support and it cannot be considered as a contract to-

wards third parties.

Summary of Contents for RIVA COMPACT HE MK2 M96A.24SR/C

Page 1: ...tallation instructions RIVA COMPACT HE MK2 Models M96A 24SR C System boiler M96A 28SR C System boiler U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n e y R o a d B r a d f o r d...

Page 2: ...low to the boiler is fitted with all the safety and control de vices required by the current Regulations n Ensure that the installer has connected the pressure relief valve outlet to a drain pipe The...

Page 3: ...ng contact lenses Irritation to respiratory tract Precautions Dust goggles will protect eyes People with a history of skin complaints may be particularly susceptible to irritation High dust le vels ar...

Page 4: ...ex ternal controls such as a room thermostat By this method if you have a subsequent prob lem following the addition of an external con trol you can eliminate the boiler from your fault analysis n Do...

Page 5: ...Choice of flue 22 6 9 Electrical connections 25 6 10 External frost protection 26 6 11 Connecting a system boiler to a cylinder 27 7 Commissioning 30 7 1 Electrical installation 30 7 2 Gas supply inst...

Page 6: ...e normal oper ation of the boiler It must be used only by a qualified person during commissioning and servicing 1 3 Isolation valves 12 11 13 10 Fig 1 2 bottom view of the boiler 10 Condensate drain p...

Page 7: ...y air pressure sensor Lack of burner ignition no ignition signal from the full seqence ignition device Safety thermostat lock out Flue temperature probe NTC lock out Flame detection error Other faults...

Page 8: ...nce is provided with a built in anti freeze system that operates the boiler when the temperature is below 5 C Therefore when the boiler is not lit or used in cold weather with consequent risk of freez...

Page 9: ...ts must be carried out by a quali fied person therefore we advise you to contact your installer or Service Agent Adjustment of the boiler temperature alters the gas flow at the burner according tothe...

Page 10: ...ch 2 Shut off the gas supply cock 12 and the valves for the water circuits fitted under the boiler Fig 2 8 3 Empty the water circuits if necessary as shown in section General access andemptying hydrau...

Page 11: ...oiler it is advisable to arrange maintenance and cleaning by an Authorised Service Centre En gineer at least once a year During the service the most important compo nents of the boiler will be inspect...

Page 12: ...velas described in the section 2 2of thismanual If topping up with water has to be done very fre quently have the system checked for leaks If water comes out of the pressure relief valve Check on the...

Page 13: ...ger valve 24 Pump vent plug 25 Pump 26 C h pressure relief valve 27 Modulation gas valve 28 Modulation operator 29 Gas valve outlet pressure test point 30 Gas valve inlet pressure test point 31 Primar...

Page 14: ...29 25 26 27 30 23 38 11 13 12 37 14 32 20 28 19 33 21 18 22 10 17 Fig 4 2 INSTALLATION U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n e y R o a d B r a d f o r d B D 8 9 H Q 0 1...

Page 15: ...of water through the primary heat exchanger 4 4 Expansion vessel Note this boiler is designed for operation only in a sealed central heating system The height difference between the pressure relief va...

Page 16: ...17 2 000 20 2 500 25 1 mbar approximately equals 10 mm H2O Gas pressures at the burner Gas Natural G20 Butane G30 Propane G31 Max Pa mbar 1130 11 3 2810 28 1 3610 36 1 Min Pa mbar 250 2 5 580 5 8 780...

Page 17: ...t temperature D C 71 Mass flow rate D g s 16 0 Flue gas figures Nominal heat input A D kW 25 0 CO2 content 6 5 O2 content 9 3 CO content ppm 75 Exhaust temperature D C 71 NOx class 2 Weighted NOx ppm...

Page 18: ...17 2 000 20 2 500 25 1 mbar approximately equals 10 mm H2O Gas pressures at the burner Gas Natural G20 Butane G30 Propane G31 Max Pa mbar 1130 11 3 2810 28 1 3600 36 0 Min Pa mbar 240 2 4 580 5 8 780...

Page 19: ...t temperature D C 69 Mass flow rate D g s 17 8 Flue gas figures Nominal heat input A D kW 29 0 CO2 content 6 8 O2 content 8 8 CO content ppm 52 Exhaust temperature D C 69 NOx class 2 Weighted NOx ppm...

Page 20: ...lectrical provisions of the Building Regulations applicable in Scotland with respect to the installation of the combined appliance in a room containing a bath or shower For Ireland IE reference should...

Page 21: ...the boiler inlet connection should not be used Installation pipes should be fitted in accordance with BS 6891 and the complete installation should be tested for tightness For Ireland IE refer to I S...

Page 22: ...uilt in automatic air release valve it should be ensured as far as possible that the appliance heat exchanger is not a natural col lecting point for air Except where providing useful heat pipes should...

Page 23: ...dues swarfs oils and other installation de bris is removed Where a new boiler is fitted to an existing system it is important the debris from the existing system is fully removed in order to ensure th...

Page 24: ...minimum gaps indicated in Fig 6 1 25 50 250 200 Fig 6 1 all dimensions in mm When installing the boiler in a cupboard cover or alcove allow at least50mm permanentclear ance from the front face of the...

Page 25: ...ke the protective caps off the boiler pipe work 2 Thoroughly clean the connections 3 Mount the boiler on its bracket 4 Fix the c h valves A and gas cock B to the boiler using the gaskets Fig 6 3 5 Fix...

Page 26: ...scharge horizontally it is not de signed to enable termination in the vertical plane Vertical kit with 90 elbow Fig 6 6B Co axial 60 100 mm Supplied with a straight flanged adapter a co axial elbow an...

Page 27: ...rs with different size are supplied with the twin pipe kit and have to be installed between the boiler and the air intake adapter Fig 6 10 Air intake adapter Restrictor Gasket Fig 6 10 For the correct...

Page 28: ...rough a telescopic co axial flue 450 950 mm In the last section the fumes are expelled through a vertical section Extensions and elbows can be added to extend the kit s length 90 1 m 45 0 5 m 90 0 85...

Page 29: ...switch to the power supply terminal block of the boiler Fig 6 17 keeping the same connections for the live brown wire and the neutral blue wire External 3 A fuseor fused plug with same current rating...

Page 30: ...trol flexible cord as illustrated in Fig 6 20 Lock the flexible cords in place with the flexible cord clamps To the fused spur To the external control device isolation switch Fig 6 20 6 10 External fr...

Page 31: ...must be connected to The lower part shows how to realize a system that provides independent timed and thermostatic control of heating and hot water In Fig 6 23 the boiler is permanently connected to...

Page 32: ...V a c Switched 3 Amp fused spur L N 2 3 1 Programmer HTG HW OFF HW ON L N 2 1 4 6 7 Power supply L N 2 3 1 1 2 3 External control terminal block 8 10 way junction box Valve colour key WH White GRYE Gr...

Page 33: ...Switched 3 Amp fused spur L N 2 3 1 Programmer HTG HW OFF HW ON L N 2 1 4 6 7 Power supply L N 2 3 8 External control terminal block 10 way junction box Mid position diverter valve HTG Heating HW ON H...

Page 34: ...n the appliance and check the gas connector on the appliance for leaks Open position 12 Fig 7 1 7 3 Initial filling of the system 1 Open the c h flow and return valves 2 Remove the front panel of the...

Page 35: ...heat 1 Turn on the electricity supply to the boiler switching on the fused spur isolation switch The appliance operation light 9 will flash every 4 seconds 2 Turn the function selector 7 as in Fig 7 3...

Page 36: ...e checked and adjusted if necessary Important after the gas pressure checks and any adjustmentoperations allof the testpoints and adjustment devices must be sealed Re place the adjustment protection c...

Page 37: ...grity of the conden sate drain pipe Verify the cleanness and correct filling of the con densate traps 7 11 Instructing the user Hand over this combined User Installation man ual and the Servicemanual...

Page 38: ...Carry out the conversion for the type of gas re placing the burner injectors correctly 6 Re assemble the burner the front panel of the combustion chamber 7 Switch on the appliance at the mains isolati...

Page 39: ...eration turn it ON by the function selector 7 on the desired operation and checking the ignition pressure and that the burner lights up uniformly In any case the boiler automatically resets to its nor...

Page 40: ...ce and turn off the gas cock before carrying out any pro cedures whatsoever for cleaning mainten ance opening or dismantling boiler panels 9 2 Dismantling the external panels Front panel A Sampling po...

Page 41: ...it is sufficient to dust it with a bristle paintbrush To reach the burner 1 Take off the front of the case 2 Take off the removable front of the sealed chamber and thefront panelof thecombustion chamb...

Page 42: ...U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n e y R o a d B r a d f o r d B D 8 9 H Q 0 1 2 7 4 4 8 8 3 8 8 w w w h e a t i n g s p a r e s 2 4 7 c o m...

Page 43: ...U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n e y R o a d B r a d f o r d B D 8 9 H Q 0 1 2 7 4 4 8 8 3 8 8 w w w h e a t i n g s p a r e s 2 4 7 c o m...

Page 44: ...o 0121 506 1340 Sales Fax No 0121 506 1360 Service Tel No 0121 506 1350 Service Fax No 0121 506 1370 www biasi co uk 03 12 2008 N U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n...

Reviews: