Biasi SG Series
Page 25
•
Mount the 7248 control to the side of the
casing in the rear of the boiler. Position the
aquastat so that the sensor is able to reach the
immersion well installed in the back of the
boiler where it will be installed.
•
Run wire harness “A” under the top panel of
the boiler casing.
•
Connect the female connector from harness
“A” to the male connector of harness “B”.
•
Harness “C” connects to the burner. Run the
harness behind the front panel of the boiler
and connect it to the male harness on the
burner.
•
Bring line voltage into the power terminals of
the 7248 high limit aquastat.
•
Connect the “TT” terminals of the 7248 to the
end-switch on a external control or to a room
thermostat.
•
For more detail, please refer to the wiring
diagrams on the following pages.
12. Wiring
B
C
A
Summary of Contents for SG 2
Page 2: ...Page 2 Biasi SG Series...
Page 26: ...Page 26 Biasi SG Series 12 1 Oil Burner Wiring...
Page 27: ...Biasi SG Series Page 27 12 1 Oil Burner Wiring...
Page 28: ...Page 28 Biasi SG Series 12 2 Gas Burner Wiring TO EARTH GROUND LINE HONEYWELL 7248U...
Page 29: ...Biasi SG Series Page 29 12 2 Gas Burner Wiring...
Page 37: ...Biasi SG Series Page 37 Notes...
Page 38: ...Page 38 Biasi SG Series Notes...
Page 39: ...Biasi SG Series Page 39 Notes...