45
SCARPAVAPOR
®
PLUS
0
1
I
II
O
3
0
5
10
15
20
25
30
35
40
45
50
55
60
0
1
I
II
O
3
0
5
10
15
20
25
30
35
40
45
50
55
60
ENGLISH
8. IGNITION
1.
Connect the power plug grounded in to the
outlet base. Connect the power plug in to the
grounded outlet of the vacuum hood.
2.
Turn the base switch on position “ON/1” posi
-
tion to start the boiler. The pump automatically
loads water into the boiler. An automatic char
-
ging system consisting of an electronic board
and a pump, maintains the water level constant
during use. The first filling of the boiler can take
up to ten minutes.
3.
The pressure is reached in about fifteen mi
-
nutes and is signalled by the “STEAM READY”
indicator light.While operating, the pressure on
the pressure gauge (5 ÷ 6 bar) undergoes oscil
-
lations depending on the amount of steam de
-
livered.
When using steam the pressure gauge
will indicate a lower pressure.