December 2019
7
Installation, Operation and Maintenance Manual
VCIOM-08500-EN
Storage and Pre-Installation
Section 2: Storage and Pre-Installation
Figure 6
2.3
Checks to be Performed Before Installation
•
Make sure that the valve to be motorized is appropriate for coupling to
the actuator.
•
The electrical supply cables must be suitable for the power rating
(refer to the test certificate that comes with the actuator).
•
Gather the right tools for assembly and for setting the actuator controls.
If the actuator has been stored for a long period of time prior to its installation, make sure to:
•
Check the condition of the O-ring seals.
•
Check the installation of the plugs or conduit glands on the conduit entries.
•
Check if the enclosure covers or the actuator body are cracked or broken.
•
Check the oil level in the actuator and top up if necessary.
•
Put the batteries back into place
(see Section 11.3, Maintenance - Lithium battery change).