**SEE THE FOLLOWING PAGE FOR NFPA 13 REGULATIONS**
The field crew supervisor and facility manager are to walk through the completed installation.
The installation is complete and on time in accordance with the original Check-In document. If not, explain:
Conduit runs are installed in accordance with the Check-In document, Scope of Work, and Layout. If not, explain:
The fans are correctly placed in accordance with both the Check-In document, Scope of Work, and Layout. If not, explain:
Breaker size and wire type are in accordance with the Check-In document, Scope of Work, and Layout. If not, explain:
All safety rules and regulations met in accordance with the Check-In document, Scope of Work, and Layout. If not, explain:
Fans have been running for over an hour and operate without visible defect or issue.
The fan is spinning in the correct direction (counterclockwise when viewed from floor).
Angle irons are securely fastened and are without any apparent problems in accordance with installation techniques discussed
at check-in.
If extension tube is 4 ft (1.2 m) or longer, guy wires are in place and there is no evidence of a wobble.
Supervisor or contractor has supplied and explained the Installation Guide. If not, explain:
The supervisor or contractor has explained and I understand how to operate fan including starting/stopping, speed operation,
and power disconnect. If not, explain:
Time in/out and duration are in accordance with Check-In document.
Additional comments:
2348 Innovation Drive
Lexington, KY 40511
Phone: 1-859-233-1271
www.bigasssolutions.com
Close-Out Procedure
(for Big Ass
Fans Certified Installers Only)
Date:
Company:
Job Name:
Address:
Purchase Order No.:
City/State/ZIP:
Contact Name:
Phone:
E-mail:
Summary of Contents for Basic 6
Page 1: ...INSTALLATION GUIDE For help call 1 877 BIG FANS or visit www bigassfans com Basic 6 ...
Page 6: ...Notes ...
Page 48: ...Notes ...
Page 50: ......
Page 63: ......