www.B-TEK.com
2016
Pit Type Truck Scale Installation Manual
18
Adjusting the Checking
Once assembled, verify that the scale is centered in the foundation. If it is not, make the appropriate adjust
-
ments. With the modules bolted together, adjust the end bumper checking and the side checking stands. The
poly bumpers on the end wall, and the bolt heads on the side checking stands should be approximately 1/16”-
1/8” away from the end wall and scale structure respectively.
Replacing the Dummy Load Cell Stands
Once the end and side checking has been adjusted the dummy load cell stands will need to be removed and
replaced with the actual load cells. It is imperative that the checking has been adjusted to minimize the lateral
movement of the weighbridges when replacing the stands.
Prior to lifting a module / weighbridge place safety blocking under one of the main weighbridge
structural beams with approximately 1/2” gap between the block and bottom of the beam. This will stop
the module from falling to the foundation in the case of a stand or load cell falling over.
Starting with a load cell dummy stand in the first end module, use a hydraulic jack to lift the weighbridge in a
location close to the stand being removed. Place the jack under the outermost beam for the lifting location.
Note that on concrete deck scales that have already been poured, it is recommended to use two hydraulic
jacks placed on opposite sides of the module to lift the module in a level position. Lifting the module unevenly,
mid-section or between load cell locations will cause cracks in the concrete.
Summary of Contents for BTEK BS-FECD-P-CPD-M
Page 1: ...BS FESD P CPR M BS FESD P CPD M BS FECD P CPR M BS FECD P CPD M Models Include ...
Page 2: ...www B TEK com 2016 Pit Type Truck Scale Installation Manual 2 ...
Page 22: ...www B TEK com 2016 Pit Type Truck Scale Installation Manual 22 See larger drawing in packet ...
Page 23: ...2016 www B TEK com Pit Type Truck Scale Installation Manual 23 See larger drawing in packet ...