background image

www.B-TEK.com  

2016

Pit Type Truck Scale Installation Manual

6

Choosing a Site

The first step in installing the scale is to choose an appropriate site. Pertinent steps in choosing the site are:

 

Ensure that the site has adequate approaching / exiting distance to comply with state and local Weights  

 

and Measures regulations. Scale length and scale elevation (maximum fall per foot allowance) will 

 

impact the total area requirement.

The site selected must meet state and local requirements. The following is taken directly from Handbook 44 

(H-44) issued by the National Institute of Standards and Technology.

 

UR.2.6. Approaches

 

UR.2.6.1., Vehicle Scales - On the approach end or ends of a vehicle scale installed in any one   

 

 

location for a period of six months or more, there shall be a straight approach as follows:

 

(a) The width at least the width of the platform, and

 

(b) the length at least one-half the length of the platform but not required to be more than 40 feet, and

 

(c) not less than 10 feet of any approach adjacent to the platform shall be constructed of concrete or    

 

  similar durable material to insure that this portion remains smooth and level and in the same plane    

 

  as the platform.  However, rating of sufficient strength to with stand all loads equal to the sectional

 

  capacity of the scale may be installed in this portion.  Any slope in the remaining portion of the 

 

  approach shall insure, 1) ease of  vehicle access, 2) ease for testing purposes, and 3) drainage  

 

 

  away from the scale.

 

The scale drawings provided meet part (a) of this requirement. The site must be located to meet parts (b) and (c).

The site should have adequate room for trucks to properly align with the platform before pulling on. This is 

especially important if trucks must turn before driving onto the scale.

Trucks should remain on the scale for a period of time no longer than is necessary for obtaining the vehicle 

weight. Drivers / passengers / pedestrians should not exit their vehicles or use the scale platform as a walkway.

Some jurisdictions require that the scale platform be clearly visible from the location of the scale instrument. 

Others will allow the use of closed circuit TV or even a voice intercom. Obtain official approval before starting 

construction.

• Check all state and local Weights and Measures requirements before breaking ground to ensure compliance   

  with all regulations.
• Obtain all necessary permits for construction.

• Check all public utilities to ensure that your site is free of underground lines, pipes or hoses.
• Have assurance that the soil at the site is capable of withstanding a minimum pressure of 3,000 psf or as  

 

  specified on the B-TEK, Inc. drawing / print.

• Make sure the site does not intersect existing drains or utilities.
• All surrounding areas must drain away from the scale site.

• Ensure that all overhead objects (i.e. power lines, lights) do not interfere with unloading and setting the scale   

  modules with a crane.

Summary of Contents for BTEK BS-FECD-P-CPD-M

Page 1: ...BS FESD P CPR M BS FESD P CPD M BS FECD P CPR M BS FECD P CPD M Models Include ...

Page 2: ...www B TEK com 2016 Pit Type Truck Scale Installation Manual 2 ...

Page 3: ... 8 Locating Plate Page 11 Lifting Modules into Place Page 11 Connecting Modules Page 14 Order of Module Installation Page 15 Conduit Installation Page 16 Concrete Deck Scale Preparation Page 17 Adjusting the Checking Page 18 Replacing the Dummy Load Cell Stands Page 18 Aligning the Load Cells Page 20 Connecting the Grounding Cables Page 21 Load Cell Cable Wiring Page 21 Maintenance Page 24 Spare P...

Page 4: ...ts and Measurements authority prior to installation to verify that the foundation meets all requirements including those of the National Institute of Standards and Technology NIST and spe cifically Handbook 44 Prior to installation it is the customer s responsibility to verify that the equipment meets the requirements of the application Do not begin installation if this is unknown It is the custom...

Page 5: ... do not locate indicators in direct sunlight or in areas subject to extreme temperature changes as this may affect the accuracy of the weighing You have a copy of the scale and foundation drawings specific to this installation on site at the time of installation You have a copy of this manual on site at the time of installation The foundation concrete has had a full twenty eight day period for pro...

Page 6: ...ortion of the approach shall insure 1 ease of vehicle access 2 ease for testing purposes and 3 drainage away from the scale The scale drawings provided meet part a of this requirement The site must be located to meet parts b and c The site should have adequate room for trucks to properly align with the platform before pulling on This is especially important if trucks must turn before driving onto ...

Page 7: ... Institute Code Allow the concrete foundation time to cure before erecting the scale Insufficient curing time of concrete may result in damage to the structural integrity of the scale foundation Unload the shipping crate of scale components prior to unloading scale platform modules from the truck to verify you have everything included on the packing list Open all boxes for individual equipment pie...

Page 8: ...d with a punch Foundation drawings 4 way lifting chains with of 15 20 lengths to each corner 100 measuring tape Chalk line Laser level and or transit Hydraulic jack s Dummy load cells Various size wrenches and sockets 13mm 9 16 3 4 1 1 8 1 5 16 and 1 7 8 Pry bars Hand tools for working with cables wires Level s Foundation Base Plate Layout Verify that the foundation dimensions are correct and accu...

Page 9: ...cluded with scale 5 2016 Center Line Center Line Foundation Base Plate Center Marks Note that the foundation base plates will be a combination of basic plates and combination plates that have the checking assemblies included as shown below BASIC BASE PLATE COMBINATION BASE PLATE with SIDE CHECKING four per scale ...

Page 10: ...Ring Lower Receiver Isolation Ring Upper Receiver Grounding Straps Shim Plates It is recommended to layout all foundation base plates prior to permanently anchoring to the foundation Set the foundation plates in place Do not secure the plates to the foundation at this time Ensure that the foundation base plates are all level with each other Shim plates for use on the top of the foun dation base pl...

Page 11: ...s prior to lifting the modules into place The first module to be placed onto the foundation is an end module which should be placed directly after the end wall The four dummy mount assemblies should already be in place on the base plates located on the chalk line centers on the foundation Prior to lifting the end module attach two 8 hole mounting plates to the end of the module closest to the cent...

Page 12: ...alling the weighbridge mod ule onto the dummy load cell stands ensure that safety supports such as wood blocking is placed under the weighbridge module being lifted Lift the end module with the 8 hole upper receiver plate already bolted in place over the four dummy cell stand assemblies and slowly lower the module so that the button on top of each dummy stand is inserted into the thru hole located...

Page 13: ... from both main beams to the pit wall to ensure that the distance is the same and that the module is parallel with the end wall The measurements should be within 1 8 of each other If they are not adjust the module by leveraging a pry bar between the module and end wall to achieve squareness The end modules are shipped from the factory with the end bumpers and 3 8 thick backing plates installed If ...

Page 14: ...end that has the welded mounting plates located closest to the end wall and the end with the mounting and splice plate holes mating with the connecting module The module will be lowered onto the 8 hole mounting plate connected to the adjacent module and onto the dummy stands at the opposite end Install the remaining hardware in the mounting plates and then install the remaining splice plates betwe...

Page 15: ...ype modules 1 Module starting at end wall location 2 Module resting on mounting plate of first module and subsequent modules will rest on second module s mounting plates 3 Last module rest on previous module s mounting plate welded mounting plate next to the end wall 4 cell module starting at end wall location ...

Page 16: ...scale for a concrete deck pour The conduit is shipped loose in 10 lengths Conduit must be cut to length in the field as needed for the scale s length and width Enough conduit is supplied for the scale length and width at each load cell location Conduit clamps are included as well with larger beam clamps for connecting to main beams and slightly smaller clamps for connecting to crossmembers Three c...

Page 17: ...s a temporary crossmember under the sheeting You will need to notch the two top corners to avoid interference with the radii between the top flange and web Cut two additional pieces of lumber to support both ends of the crossmember These pieces will fit between the bottom of the wooden crossmember support and the top side of the bottom flange of the main beams This distance may vary Take a measure...

Page 18: ... adjusted to minimize the lateral movement of the weighbridges when replacing the stands Prior to lifting a module weighbridge place safety blocking under one of the main weighbridge structural beams with approximately 1 2 gap between the block and bottom of the beam This will stop the module from falling to the foundation in the case of a stand or load cell falling over Starting with a load cell ...

Page 19: ...te amount of grease on the top button of the load cell bottom cup Slide the foam ring over the top of the load cell bottom cup aligning with the antirotation pin that is protruding Place the load cell onto the assembly taking care that thenotch in the bottom of the load cell aligns with the anti rota tion pin The cable connector on the load cell should face the center of the scale towards the cond...

Page 20: ...is aligned both horizontally and vertically by ensuring that the air bubble is visible between marked lines If the load cell is out of level adjustments can be made by realigning the foundation base plate Repeat the check with the level to verify that the load cell is aligned correctly Continue to readjust the locating plate as needed B TEK Load Cell Surface Level Once the entire scale has had the...

Page 21: ... diagram on the following pages Additionally a wiring diagram was included with your scale package along with the foundation drawing It is important that all cables be installed so that they do not touch the ground and are internal to the scale Zip tie all excess cable and attach to hangers near the junction box Your digital Pit Style scale package will include all load cell cables junction box es...

Page 22: ...www B TEK com 2016 Pit Type Truck Scale Installation Manual 22 See larger drawing in packet ...

Page 23: ...2016 www B TEK com Pit Type Truck Scale Installation Manual 23 See larger drawing in packet ...

Page 24: ... lock washer HW B 1 4 20X1 1 4 20 X 1 L hex bolt J box mounting bolt HW N 1 4 20H 1 4 20 hex nut J Box mounting nut HW W 1 4L 1 4 lock washer J box mounting washer HW W 1 4F 1 4 flat washer J box mounting washer HW B 5 16 18X 75 5 16 18 X 3 4 L hex bolt Buss bar bolt HW N 5 16 18H 5 16 18 hex nut Buss bar nut HW B 5 8 11X2CSCS 5 8 11 X 2 L socket counter head cap screw Deck plate mounting bolt HW ...

Page 25: ...up Load cell mount assembly 899 100021 75K 100K foam debris ring Load cell mount assembly 899 100025 M6 X 30 anti rotation pin Load cell mount assembly 899 100022 75K Lower receiver mount Load cell mount assembly 899 100043 100K Lower receiver mount Load cell mount assembly 899 100023 75K Isolation disc Load cell mount assembly 899 100039 100K Isolation disc Load cell mount assembly 100 61071 Shim...

Page 26: ...B TEK Scales LLC 1510 Metric Ave SW Canton Ohio 44706 800 266 8900 Direct 330 417 8900 Fax 330 471 8909 Monday Friday 7 00 AM 5 00 PM www B TEK com sales b tek com ...

Reviews: