background image

IMPORTANT SAFETY NOTICES

      

   

ALWAYS BE ON THE SAFE SIDE – IMPORTANT SAFETY TIPS

This building should be constructed by at least two adults.

- Do not use this product if it has been modified or damaged.
- Allow adequate time to complete construction.  If you hit any snags, take a break, keep calm, and seek additional help if 
  necessary.
- Make sure that there is adequate space around the construction site to enable access to all sides of the building during 
  construction.
- Do not attempt to construct the building in strong winds or poor weather conditions.
- Make sure that any ladders used during construction are in a good condition and that all tools are in good working order.
- The building is not completely stable until construction is complete and the roof of this building is not intended to 
  support significant weight.  

Do not climb on the roof.

- Keep bags, nails and fixings out of the reach of children.

- Please retain the instructions for future reference

.   

Due to the nature of wooden panel products please watch out for the following minor blemishes:

- Protruding nails = hammer in the nails so that they are flush with the wood’s surface.
- Splintered wood = smooth down with sandpaper.
- Loose or dead knots = use a non-toxic wood glue to secure.
- Wear protective gloves and robust clothes during construction.
- Make sure that any paint or preservative that you use is non-toxic and complies with EN71 regulations.
- Perform periodical checks throughout the life of the building to ensure that the original condition is maintained.
- Construct your building within a month of delivery to reduce the chances of the panels / boards warping.

PRODUCT WARRANTY

- If there is any cause for concern or any other problems are found on or after delivery, such as damaged parts 

DO NOT 

  BUILD

, please visit our Support Centre - www.gardenbuildingsdirect.co.uk/help for further advice and resolution and

stop all use before assembly until issues are resolved. Ensure any replacement parts are fitted in accordance to the 

product instructions.

IMPORTANT:

 

 Throughout the life of the building please conduct checks to ensure the original condition is maintained.  

- It is advised that the building is checked over prior to use each and every time.

- Please check the structural integrity of the building.

- Ensure the hinges of the door(s) are still in good working order regularly.

- Check the whole of the building for splintering. If this occurs please sand down the problem area and re-treat.

- Check that the fixings of the building are fit for purpose over the product’s life.

- Please ensure that any cracks that should appear in the product are not situated on any joints.

- Cleaning of the building on a regular basis is advised to increase longevity.

MAINTENANCE

- Products are built to the highest quality standards and should provide convenient, secure storage for  years to come, 

  this of course being subject to reasonable use, care and transportation.

     

    

GENERAL RECOMMENDATIONS

Thank you for purchasing this building.  We hope you will be delighted with your new building for many years to come.  

These instructions have been written as a guide to assembling this building and will provide you with an overview of 

the process of constructing this building.  There are a number of considerations to be thought of before constructing 

the building and how to maintain your building upon completion.  This section is also aimed at ensuring you are aware 

of considerations such as: location for construction, treatment of the building and construction information. 

   

GLAZING: 

The glazing is generally bound with a holding band and may look like one thick piece when delivered. It 

may even be in between two of the panels as might the fixing kit. 

REMOVE PROTECTIVE FILM FROM ALL GLAZING 

BEFORE USE

.  The glazing is safer to use than glass and is an economic solution for garden building use, but must be 

installed correctly, carefully and safely.  Glazing that is fitted to the outside of buildings is an uncomplicated method 

that does not require beading.  The glazing on all the garden buildings does not make the windows water tight and 

we suggest using a silicon sealant to improve water resistance around the edges of the glazing.

   

DOORS:

 Generally the doors are sent loose for all buildings.  Some buildings such as summerhouses may have the 

doors already fixed to the door frame.  If your building is not built on a flat, level surface you may experience difficulties 

when fitting your doors.  The doors are not waterproof and you may find a gap between the doors or around the edges.  

This is not a fault as the doors will move, shrink and expand during different weather conditions. Occasionally during 

transit the door frame can become misaligned. This is easily solved by hanging the door on a level surface 

BEFORE 

the 

panels are attached. 

SUMMERHOUSES

: Some summerhouse doors are held together at the base of the frame with a 

screw or nail for transportation purposes.  Remove this screw or nail before commencing construction. 

PLAYHOUSES:

 There is a gap around the door to provide ventilation and to prevent a finger trapping hazard.

 

AFTER MARKET MODIFICATION

- We do not recommend modifying this product. However, customers do enjoy modifying their buildings with their own 
  specific needs in mind as our products allow for a wide range of uses. 
- If you modify this product for your own personal requirements you are doing so at your own risk.
- Customers who modify their buildings should make sure to do so safely and so that they do not affect the integrity of 
  the structure.  
- If you are thinking of modifying this building be aware that any modifications invalidate your warranty and may affect 
  your consumer rights. 
- We do not recomend fitting optional building parts, such as a base, from a different manufacturer  to ensure safety standards 

  

- If in doubt about the product’s limitations please read and understand all of the instructions and guidance notes.  If

  necessary please contact the retailer that the item was purchased from.

    

- Please contact the retailer from which the product was purchased from for warranty and guarantee information.

- PLEASE NOTE: The warranty does not extend to damage caused by post-purchase transportation, careless handling or

  damage caused by misuse or modification.

- Treat your building annually with a quality timber treatment to comply with the buildings warranty.

BUILDING LOCATION & CONSTRUCTION: 

Locate your building in a suitable and well prepared area, which is flat and 

protects the building as much as possible from extreme weather conditions such as high wind, snowfall, flooding etc.  

It is very important that a solid and level foundation is prepared to ensure the building will be level and square. 

 This will 

help ensure that all parts fit correctly.  The building is not fully structurally sound until construction is complete.  You 

may experience moments, such as when building the wall panels, where you feel the building is not safe and may be 

flexing too much. This is perfectly natural so do not worry and take your time as full rigidity for the building will only 

occur on completion of the construction process. 

We recommend that you construct your building within 1 month of 

delivery as the timber may begin to warp. 

 

PLAYHOUSES:

  There are two holes in the rear gable for ventilation purposes.  

TREATMENT: 

Treating the product when assembled is essential to ensure the building will not deteriorate.  We 

recommend you apply the finishing product to a small area to ensure it provides the intended result before proceeding.

IMPORTANT NOTICE: 

The natural moisture content of wood will change according to season.  We recommend 

applying a quality timber treatment to minimise the effects.  Re-apply treatment annually to prolong the building’s life.

 

 

WOOD CHARACTERISTICS:

 Wood is a natural material, which means that no two boards on your building will be 

identical and  will expand and contract due to moisture levels.  This natural affect of expansion and contraction is 

inevitable and is compensated for by the tongue and groove construction in tongue and groove buildings.  The timber

in overlap buildings may warp and twist over time, which is a natural process. The timber may crack naturally over time, 

but will not affect the structural integrity of the building provided it has been assembled as advised.  Keep panels and 

your building out of direct sunlight and away from extreme temperatures and away from trees, fences and other high

moisture containing elements to reduce and help prevent warping.

This building is water resistant, but not water tight. Please wait for weather to change before notifying us if you notice changes in the structure

.

TOOLS REQUIRED:

 - Drill with 4.5, 3 and 2mm drill bit / Hammer / Spirit Level / Measuring Tape / Screwdriver (Phillips) / 

Stanley Knife / Wood Saw / Step Ladder. 

PLEASE NOTE:  You are advised to pilot drill all screw holes and ensure all screwheads are countersunk.

   

CUSTOMER SERVICE: 

If there are any queries regarding the building construction or aftercare please contact the 

supplier of the building who will do their upmost to ensure customer satisfaction.

    

ADDITIONAL SAFETY RULES AND GUIDELINES:

 

- No one should use the equipment until properly assembled.

- Read the instructions thoroughly a couple of times before attempting each section of the build.

- Make sure you have adequate space, a safe working environment and a flat level base to work on. 

- Take your time, do not panic.

- Construct your building within one month of delivery to stop parts warping / bowing.

   

     

 

ADDITIONAL SAFETY RULES AND GUIDELINES SPECIFIC

 

FOR PLAYHOUSES ONLY: 

- If your child suffers from any physical condition that could affects his/her ability to use the building it is highly 

  recommended that you consult a doctor before allowing them to use the equipment.

- Playhouses are designed for children between 3-10 years of age, with a maximum individual user weight of 50kg.  

- Adults should not use playhouse equipment.

SLIDE & LADDER OPTION ON PLAYHOUSES:

 

IMPORTANT 

- The slide should be positioned to avoid full direct 

sunlight at the hottest part of the day to avoid over heating and causing injury. The slide should not be installed over 

concrete, asphalt, slabs or any hard surface. If your product comes with a ladder or slide it is extremely important to 

continually check the fixings of the slide and the ladder to the building as injuries may occur if these parts become 

loose or detached.

PLAYHOUSES:

IMPORTANT

:  THROUGHOUT THE LIFE OF THE PLAYHOUSE PLEASE CONDUCT CHECKS TO ENSURE THE ORIGINAL CONDITION 

  IS MAINTAINED. FAILURE TO CARRY OUT MAINTENANCE ON THIS BUILDING COULD CAUSE THE PRODUCT TO BE HAZARDOUS.  

IMPORTANT

: PRODUCT MUST BE CHECKED AT THE START OF EACH SEASON MINIMUM, ENSURING IT IS SAFE TO USE.   IT IS 

  ADVISED THEREFORE THAT THE PLAYHOUSE IS CHECKED OVER PRIOR TO USE EACH AND EVERY TIME.

GARDEN BUILDINGS: 

THESE PRODUCTS ARE INTENDED FOR DOMESTIC AND OUTDOOR USE ONLY. 

These products have been designed as an affordable solution to most popular light domestic uses. 

WARNING: PLAYHOUSES ARENOT SUITABLE FOR CHILDREN UNDER 36 MONTHS AS THEY ARE NOT STABLE ON THEIR FEET

 

Children are unaware of the dangers of play, therefore, It is important to supervise your child at all times whilst playing in a playhouse.

For Queries and Help please access our Support Centre:

www.gardenbuildingsdirect.co.uk/help

Summary of Contents for INS-0072

Page 1: ...ions Please read the instructions carefully and please retain for future reference Please note that all images are for illustration purposes only For Queries and Help please contact Product Support 01...

Page 2: ...thinking of modifying this building be aware that any modifications invalidate your warranty and may affect your consumer rights We do not recomend fitting optional building parts such as a base from...

Page 3: ...with the fixing kit for safer transportation If they are still not found please visit our Support Centre www gardenbuildingsdirect co uk help Q What tools do I require A Drill with 4 5 3 and 2mm drill...

Page 4: ...TY x 2 FSS Floor SS or T G 1052 5mm x 1465mm EP Eaves Purlin R4C 28x28 0879 SQ QTY x 4 CP Centre Purlin R4C 28x28 1465 SQ QTY x 1 FI Final 14471 QTY x 2 FB Fascia Board 14468 QTY x 4 25877 QTY x 2 WP...

Page 5: ...ase 9ft Deep L2561 7 15734 Eze Base 7ft Gable L2105 2 15737 38mmx38mm Pressure Treated Spike 4 PT 01 11mm x 68mm Square Boards 13 SQ 01 PT 01 38mmx38mm Pressure Treated Spike QTY x 4 SQ 01 11mm x 68mm...

Page 6: ...ere to nd everything HANDY TIP Sort xings and wood kit by size and piece before starting Use a suitable drill bit for pilot hole 3mm is recommended for most 3mm or 4mm Avoid splitting wood by pre dril...

Page 7: ...ground on its shorter side Take one of the longer Side Joists 15734 This will be 2561mm and position it at a 90 degree angle to the first joist 15737 ensuring it fits against the side Drill a pilot h...

Page 8: ...r with 50mm screws S50 Repeat this process for the front Plain Gable Apex PG Tip Pre drillallholesbeforefixing PGL PGL PG PGR PGR S50 S50 S50 PP On the ground fix the rear Gable Apex PGL PGR to the Pl...

Page 9: ...ixed to the front of the Roof Panels RSS Tip Useoneofthepurlinstodrawalinealongtheboardtohelplocatewherethepurlinwillbe whenfixingtheminplace N30 N30 EP RSS The opposing front roof panels should look...

Page 10: ...sides and gables of the playhouse Make sure a nail penetrates the Centre Purlin CP at each end of the Roof Panel RSS Tip Usethisstagetosquareyourbuilding Door Gable N30 N30 N30 N30 Top View S50 S50 S...

Page 11: ...to outside of the door Metal Catch is fixed to the inside of the door S10 MC S25 MC 26 27 S30 DSB DSB DG DG Fix a Door Safety Block DSB to the Door Gable DG from the inside of the bulding using 30mm...

Page 12: ...Y x 2 21524 or 21523 34 21523 21524 level at side Front 21523 21524 or 21523 S50 S50 S50 S50 Front Picket Fence No Base Place the second length of decking next to the first ensuring there is a distanc...

Page 13: ...G WUXVV XVLQJ PP 6FUHZV 6 XW RXW WKH ODVW ERDUG WR XVK RQ HDYHV ZDOO S30 80mm Cut and lay the board L 1758mm aligned to the tip of the Gable Fix the board using 30mm Screws S30 See the image above S30...

Reviews: