Door Runner Assembly 

It  is  recommended  to  leave  the  fitting  of  the  door  runner  (  Part  #22 

)until  the  rest  of  the  greenhouse  is  complete.  As  a  first  stage  when 

building the main green house just place the nut and bolt in place on the 

left  and  right  side  as  per  the  following  photo.  These  are  the  bolts  that 

the runner (part 22) slides onto at a later stage. 

 

When  you  are  ready  to  place  the  already 

assembled  doors  onto  the  frame  please  take  note  of  the  following 

which is for the right hand door. 

 

Slide  the  runner  over  the  left 

hand  bolt  towards  the  right 

hand bolt.  

 

 

 

Then slide the first top door runner into the groove 

 

 

 

 

Push  the  door  runner  further  to  the  right  and  attach  the 

bolt into the groove and continue to push the runner over 

to complete the fitting.  

Summary of Contents for Rosette

Page 1: ...lows Part A for the 12 x 8 greenhouse Part B for the 10 x 8 greenhouse Part C for the 7 4 x 7 4 greenhouse Part D for the 8 x 6 greenhouse 3 To ensure the base is level and square the use of a spirit...

Page 2: ...tight 11 If the greenhouse is sited in an exposed location and or is exposed to high winds improvisation for extra protection may be considered If so the following is recommended Drill 3 holes in the...

Page 3: ...ure loosely then lay the next sections on top of the base as per Fig 1 Corner Uprights Offer the upright corner section to the base and slot the nut heads into the groove on the upright do this carefu...

Page 4: ...e which need to be used as shown to add additional stability to the uprights Note how the corner is completed The photo is taken Inside the greenhouse and we are looking at the Right hand corner Inser...

Page 5: ...o These are the bolts that the runner part 22 slides onto at a later stage When you are ready to place the already assembled doors onto the frame please take note of the following which is for the rig...

Page 6: ...the fitting of the door rail assembly is complicated because the door rail sits further forward than the frame To overcome this two L shaped clips are used in conjunction with each other which allows...

Page 7: ...e Collector The plastic down pipe connector slides between the gutter and the upright Tip you may need to loosen the nut and bolts to assist in this then push the plastic connector in and re tighten t...

Page 8: ...bottom section this is for the opening vent handle Once the frame is assembled this needs to be slid into the ridge frame of the greenhouse There is a rounded top on the top edge of the opening vent...

Page 9: ...Please note that there will be gap at the top of the opening vent This is normal and as it was designed to aid the opening of the window View from outside View from Inside...

Page 10: ...t catches the centre cross member to prevent the opening vent from falling through into the greenhouse Cross Member which can be moved into position once the opening vent has been installed Please mak...

Page 11: ...correct place This will move up and down as required Note how the cross members are slotted into the frame edge figure 3 Please make sure that the plastic runners are placed the correct way around fo...

Page 12: ...Figure 3 Rear of Door Figure 4 Door Front Figure 5 Bottom of Door Figure 6 Please see figure 6 which shows how door is placed into the upper door frame...

Page 13: ...further safeguard the roof panels Give similar attention to the side and rear panels This time attach 2 cords horizontally and equally spaced It is important to drill the holes in the uprights as clo...

Reviews: