Door Runner Assembly
It is recommended to leave the fitting of the door runner ( Part #22
)until the rest of the greenhouse is complete. As a first stage when
building the main green house just place the nut and bolt in place on the
left and right side as per the following photo. These are the bolts that
the runner (part 22) slides onto at a later stage.
When you are ready to place the already
assembled doors onto the frame please take note of the following
which is for the right hand door.
Slide the runner over the left
hand bolt towards the right
hand bolt.
Then slide the first top door runner into the groove
Push the door runner further to the right and attach the
bolt into the groove and continue to push the runner over
to complete the fitting.