Kerosene (Diesel)
Forced Air Heaters
NEVER LEAVE HEATER
UNATTENDED WHILE BURNING
OR WHILE CONNECTED TO A
POWER SOURCE
5
Figure 4.
Hardware Components
Unpacking
Remove the heater and all of the packing materials from the
shipping carton.
NOTE
:Save the box and packing materials for future storage.
Assembly
Check the chart below to be sure that you have all of the parts
required to assembly your heater.
Figure 5.
Frame Components FAH-K135
FFOGE Figure 5. Frame Components, Models ZB-K100 / K125 / K175 / K215
Figure 5.
Frame Components,Models ZB-K125/K175/K215
FAH-K80
FAH-K135
Wheel support frame
NO
YES
Wheel ( 2 pieces)
NO
YES
Rear Handle
NO
YES
Axle
NO
YES
Top Handle
YES
NO
Screws & Nuts (A) 2 each
YES
NO
Screws & Nuts (B) 6 each
NO
YES
Cotter Pins,Washers
NO
YES