BLOWER INSTALLATION 

 

 

 

Always have all utility lines and equipment marked by a locating service provider prior to performing 

any work. 

 

 

 

 

 

All electrical work must be properly performed by a qualified electrician per all applicable codes. 

Failure to do so may result in severe bodily injury or death. 

 

 

1.

 

The blower and blower housing must be 

mounted on a pad to avoid settling. All 

conduit/piping should pass through the pad 

from below. Blower must be located above 

flood levels. 

 

2.

 

Secure lower blower housing to pad using 4 

supplied #14 x 1½” self-tapping screws. Drill 

screws directly into blower pad. 

 
 

3.

 

Connect initial blower fittings (right). 
 

4.

 

Connect airline from FAST® unit to blower outlet 

using required piping. We recommend a union 

be installed inside the housing on the blower 

outlet piping for easy removal of blower. Keep 

all debris out of airline. All connections must be 

air-/watertight. 

 

5.

 

Connect incoming power to the blower at the 

blower junction box. Be sure to follow the 

supplied wiring diagram for the voltage at your 

specific location. All blowers are dual voltage 

and must be connected according to the proper 

diagram. Blower diagrams can be found on the 

blower’s shipping box and at the end of this 

manual.  

 

 

Summary of Contents for HighStrengthFAST 4.5

Page 1: ...0 r Installation Manual For use with MicroFAST 4 5 9 0 HighStrengthFAST 4 5 9 0 NitriFAST 4 5 9 0 MyFAST 1 0 Installation Manual FASTIM 002 REV 30 JUN 2022...

Page 2: ...1...

Page 3: ...ATION 7 CROSS BRACE 7 COMPONENT INSTALLATION 8 BLOWER AIR SUPPLY LINE 8 SECURING RECYCLE TROUGHS AND BLOWER AIR LINES 8 VENTING 9 BLOWER INSTALLATION 10 BLOWER WIRING DIAGRAM 11 1 AND 3 PHASE BLOWER W...

Page 4: ...wo components the treatment module and blower The blower provides air to the system via the air supply pipe The air supply pipe and draft tube create an airlift which mixes oxygen and waste throughout...

Page 5: ...3 REMOTE MOUNTED BLOWER The blower must be set in a dry stable place and its elevation must be higher than the normal flood level A two piece rectangular housing is included with the unit The dischar...

Page 6: ...LINER GASKET BAFFLE PLATE MEDIA LINER MODULE AIRLIFT TOP DIVERTER SCREEN OPTIONAL SaniTEE MIN ANCHOR WEDGES STAINLESS STEEL FOOT BOTTOM PVC PIPE NOT INCLUDED FOOT TOP 4 SCREWS BLOWER DOWNLIFT PIPE BLO...

Page 7: ...onal septic system However some basic guidelines should be followed 1 The FAST system must be located so that sufficient slope 2 in ft is provided for the influent and effluent lines 2 Excessive back...

Page 8: ...ove the FAST unit 3 Anchor wedges stainless steel for securing FAST unit to the tank and blower housing to the base 4 Piping for observation vent port air lines vent lines and leg extensions 5 PVC pip...

Page 9: ...Attach the leg extensions to the liner using supplied self tapping screws Stainless Steel hardware is required for installation 3 Carefully lower liner into tank using a jib crane or other approved m...

Page 10: ...er gasket until it hits the baffle plate Use a gasket grout mortar or bituminous sealant mastic in the tank effluent hole for a watertight seal between hole and effluent pipe CROSS BRACE 1 Use the sup...

Page 11: ...ST 1 0 The recycle troughs for this unit ship loose inside the liner 2 Insert each of the four recycle troughs through the hole in the liner Attach the recycle trough with its mounting point on the ai...

Page 12: ...iser or manhole below grade Run the vent pipe to the desired location and terminate above grade Provide a cover that meets safety standards Water accumulating in the vent piping must be drained to pre...

Page 13: ...pad using 4 supplied 14 x 1 self tapping screws Drill screws directly into blower pad 3 Connect initial blower fittings right 4 Connect airline from FAST unit to blower outlet using required piping W...

Page 14: ...11 BLOWER WIRING DIAGRAM 1 AND 3 PHASE BLOWER WIRING DIAGRAMS FPZ BLOWER 1 PH 3 PH SPENCER BLOWER 1 PH 3 PH...

Page 15: ...12 FUJI BLOWER 1 PH FUJI BLOWER 3 PH...

Page 16: ...13 GAST BLOWER 1 PH...

Page 17: ...n blower and FAST control panel per the electrical diagram 4 BioMicrobics control panels can also be used with optional external inputs and outputs such as dry contact input and output for alarm signa...

Page 18: ...d blower based on the electrical diagram supplied for each panel specifically Note The overload amperage setting supplied for a given motor size is pre set to the appropriate place at the factory and...

Page 19: ...16 3PH 208V 240V 1PH 208V 240V 3PH 460V...

Page 20: ...17 CONTROL PANEL SCHEMATICS...

Page 21: ...18...

Page 22: ...19...

Page 23: ...20...

Page 24: ...ration of the air lift A robust splash should be present 4 Check for excessive back pressure Seal all access covers place hand about 8 in 20 cm from FAST vent If you feel air flow then there is excess...

Page 25: ...ost of labor and all other expenses resulting from replacement of the defective parts and from installation of parts furnished under this warranty shall be borne by the owner This warranty does not co...

Page 26: ...DATE __________________________________________________________________ SYSTEM DESIGNER __________________________________________________________________ SYSTEM INSTALLER ___________________________...

Reviews: