background image

Section 7
Instrument Setup and Use for the
Column Adaptor Plate

Preparing the Aurum manifold:

Tubing provided is 4 ft. long and must be cut in appropriate pieces
before proceeding. 

Vacuum set-up conditions (please see Figure 3, page 4).

1. 

Cut tubing into 3 pieces of appropriate length.

2. 

Use one piece of tubing to connect the vacuum source to the 

right

side

of the vacuum regulator.

3. 

Use another piece of tubing to connect the left side of the vacuum
regulator to the sidearm of the filter flask.

4. 

Place a rubber stopper 

with hole

into the mouth of the filter flask.

Insert a serological pipette (or comparable) into the hole of the
stopper.

5. 

Finally, use the last piece of tubing to connect the filter flask to the
nozzle of the manifold.

Note:

The Aurum vacuum regulator is strongly recommended to

enable full control of the negative pressure within the manifold.

Vacuum purification conditions

6. 

Insert the CAP (luer ends up) into the depression in the vacuum
manifold top. Ensure that the CAP rests evenly on the gasket.

7. 

Close the unused luer fittings with the caps provided. Close caps by
rotating clockwise until light resistance is encountered. Excessive
tightening of a cap may cause the luer fitting to dislodge when the
cap is removed.

8. 

Insert the luer ends of the desired Aurum columns into the available
luer fittings, ensuring a tight fit. The manifold is now ready for
column processing according to the vacuum protocol of the
appropriate column purification kit.

9. 

After finishing the purification, rinse the CAP and Aurum vacuum
manifold with distilled water, and air-dry or wipe with paper towels.

Vacuum elution conditions

10.  When ready to elute, proceed with the appropriate spin elution step as

recommended by the protocol.

11. After finishing the elution, rinse the Aurum vacuum manifold with water,

and air dry or wipe with paper towels.

9

8

Summary of Contents for Aurum

Page 1: ...Instruction Manual For technical service call your local Bio Rad office or in the US call 1 800 4BIORAD 1 800 424 6723 Bio Rad Laboratories 2000 Alfred Nobel Dr Hercules CA USA 94547 510 741 1000 1 800 424 6723 4110115 Rev A ...

Page 2: ...Section 4 The Aurum Vacuum Manifold 3 Section 5 Instrument Setup and Use for 96 well Plates 5 Section 6 The Column Adaptor Plate CAP 7 Section 7 Instrument Setup and Use for the Column Adaptor Plate 8 Section 8 The Vacuum Regulator 11 Section 9 Troubleshooting Guide 13 Section 10 Ordering Information 15 ...

Page 3: ...re fast high quality sample preparation in both formats while maintaining the simplicity of handling associated with vacuum processing The uniquely designed vacuum regulator allows for complete control of negative pressure within the Aurum vacuum manifold Section 2 Kit Components The Aurum vacuum manifold contains the following components Vacuum manifold consisting of manifold top manifold base Co...

Page 4: ... base and top The top has an attached tubular silicone gasket allowing the manifold base and top to seal when a vacuum is introduced Attached to the opening in the manifold top is a flat silicone gasket enabling Aurum 96 well purification plates or the CAP to establish an airtight seal with the manifold top when a vacuum is applied Collectively these two gaskets facilitate self seating of all comp...

Page 5: ... manifold top and place the A stage in the depression in the center of the manifold base The etched letter A should be facing up 7 Place the waste collection tray on top of the A stage Replace the manifold top on the base ensuring complete and uniform contact between the manifold top and base 8 Place the desired 96 well plate on the manifold top and follow the instructions in the protocol for the ...

Page 6: ... us on the Web at www bio rad com aurum Vacuum manifold Vacuum filter flask Vacuum regulator Vacuum source Aurum Vacuum Manifold 96 Well Purification Protocol Overview For complete protocol consult instruction manual Tubing provided is 4 ft long and must be cut into appropriate pieces before proceeding Vacuum Setup Conditions Vacuum source to manifold 1 Use tubing to connect vacuum source to right...

Page 7: ...egative pressure within the manifold Vacuum purification conditions 6 Insert the CAP luer ends up into the depression in the vacuum manifold top Ensure that the CAP rests evenly on the gasket 7 Close the unused luer fittings with the caps provided Close caps by rotating clockwise until light resistance is encountered Excessive tightening of a cap may cause the luer fitting to dislodge when the cap...

Page 8: ... com aurum Neutralized lysate Vacuum manifold Vacuum filter flask Vacuum regulator Vacuum source Elution solution Fig 7 Vacuum regulator with clear representation of the gauge Aurum Vacuum Manifold Column Purification Protocol Overview For complete protocol consult instruction manual Tubing provided is 4 ft long and must be cut into appropriate pieces before proceeding Vacuum Setup Conditions Vacu...

Page 9: ...o Replace vacuum manifold or CAP e g manifold or CAP chips and cracks Purge step in purification If closure of wells or protocol columns e g with sealing tape restores negative pressure no corrective action needed Excessive noise Purification plate or CAP Press down gently on during vacuuming not fully seated plate or CAP to seat Gasket residue preventing Rinse manifold with even contact between d...

Page 10: ...Au ur ru um m p plla as sm miid d 9 96 6 k kiit t 2 x 96 well preps includes 2 grow blocks 2 grow membranes 2 binary units 2 lysate filtration plates and 2 plasmid binding plates 2 collection plates reagents protocol overview and instruction manual Problem Possible Cause Possible Solution Worn manifold gasket Replace gasket Incorrect negative Vacuum source connected Connect vacuum pressure from va...

Reviews: