background image

1

Content

1. Description......................................................................................................................................... 2

1.1 Intellectual property.................................................................................................................. 2
1.2 Manufacturer statement.............................................................................................................2
1.3 Warranty and maintenance services.......................................................................................... 2
1.4 User qualification...................................................................................................................... 3
1.5 About this operation manual......................................................................................................3

2. Foreword............................................................................................................................................ 4

2.1 Signs, labels and symbols..........................................................................................................4
2.2 Security considerations..............................................................................................................5
2.3 Work environment requirements............................................................................................... 5
2.4 Electricity safety........................................................................................................................5
2.5 Electrical danger........................................................................................................................6
2.6 Mechanical danger.................................................................................................................... 6
2.7 Electromagnetic interference prevention...................................................................................6
2.8 Biohazard prevention................................................................................................................ 7
2.9 Other precautions................................................................................................................... 7
2.10 Accessories list:....................................................................................................................... 7
2.11 Consumable service life

...................................................................................................... 7

3. Operational guidelines for school official cites use........................................................................... 8

3.1 Boot........................................................................................................................................... 8
3.2 Program run...............................................................................................................................8
3.3 Program manage......................................................................................................................10
3.4InstrumentManage....................................................................................................................14
3.5 UV Operator............................................................................................................................16
3.6About........................................................................................................................................17

4. Product maintenance and maintenance methods..............................................................................18

Summary of Contents for BK-HS96

Page 1: ...Automatic Nucleic Acid Extractor BK HS96 User Manual BIOBASE GROUP Version 2020 08...

Page 2: ...environment requirements 5 2 4 Electricity safety 5 2 5 Electrical danger 6 2 6 Mechanical danger 6 2 7 Electromagnetic interference prevention 6 2 8 Biohazard prevention 7 2 9 Other precautions 7 2...

Page 3: ...Manufacturer statement The contents of this operation manual are consistent with the situation of this product Biobase Biodustry Shandong Co Ltd reserves the final right to interpret this operation ma...

Page 4: ...have the following qualifications You must have read and understood this operation manual You must know computer operation to a certain level and have a good command of the instrument and software sy...

Page 5: ...terials Heat warning label When this mark appears on the instrument it is a warning for high temperature parts be careful of hot hands Anti squeeze sign When this mark appears on the instrument it is...

Page 6: ...vibration no corrosive gas With the surrounding walls or other electrical equipment to keep a distance of 50 cm or more The power supply AC 220V 50HZ only applies elevation 2000 meters below the safe...

Page 7: ...danger To prevent electrical hazards please observe the following precautions WARNING The operator must always observe the electrical safety operation regulations Only professional personnel can perf...

Page 8: ...d consult a doctor 2 9 Other precautions To use the instrument correctly please observe the following precautions WARNING Do not smoke or eat near the instrument Avoid direct sunlight when the instrum...

Page 9: ...in menus such as Program run Program manage Instrument manage UVoperator and About as shown in Figure 3 1 Figure 3 1 3 2 Program run The program run main menu contains two function buttons of Run and...

Page 10: ...ch run Figure 3 3 3 2 2 Program Run After selecting the program in the program list select Run under Program Menu to enter the operation interface as shown in Figure 3 4 Figure 3 4 After clicking Star...

Page 11: ...program file is not running the pause button and the stop button are displayed in gray state 3 During the operation of the program file all the buttons except pause button and stop button will be in g...

Page 12: ...ble click save the program name that is set Figure 3 6 3 3 2 Edit Select the Program manage menu in the main operation interface click the program name you want to change and then click Edit to enter...

Page 13: ...ock or magnetic shock and at the same time calculate the time of magnetic absorption at this position once Preheat Heat in advance to ensure that the heating step can be carried out directly into the...

Page 14: ...agnetic absorption times is 1 the experimental treatment volume of this step is 600ul No 4 Step Name Wash2 The operating plate is on the third board with a waiting time of 1min and a BlendTime of 1min...

Page 15: ...Language Settings can change the internal language display of the software Click to switch between Chinese and English Figure 3 11 Figure 3 11 3 4 2 InstrumentDebug The instrument debugging interface...

Page 16: ...U disk The interface is shown in Figure 3 12 Figure 3 12 3 4 4 Software Upgrade Insert the U disk into the USB interface of the instrument and click software Upgrade as shown in Figure 3 13 and Figur...

Page 17: ...he initiative to stop the disinfection process and turn off the UV lamp Figure 3 15 Note 1 During the disinfection of the ULTRAVIOLET lamp please do not open the front safety door If the experimenter...

Page 18: ...to be used except for the UV lamp icon Other ICONS can only be used when the UV lamp is turned off Warning In order to avoid accidents do not look directly at the UV light when the UV light is on 3 6A...

Page 19: ...y environment 6 Ensure the ventilation around the instrument when it is in use 7 Please do not use the instrument when the voltage is unstable too high or too low 8 If the instrument is not in use for...

Page 20: ...nan City Shandong Province China Tel 86 531 81219803 01 Fax 86 531 81219804 Inquiry export biobase com Complaints customer_support biobase cc After sales service service_sd biobase cc service_ivd biob...

Reviews: