5
Installation
34. Place the pipette tip waste bin for used pipette tips below
the
WASTE
position on the working area.
35. Place the solvent rack with five new, empty solvent reservoirs
in position
5
on the working area. Ensure that the solvent
feeder is pulled out into the correct position; see Figure 11.
Figure 11.
The solvent feeder in position.
Connections
Figure 12
1
2
3
4
5
.
Solvent connections located on the back wall inside the system.
Port
Label
Connect
1
S1
The S1 solvent inlet line (right port) and the
S1 solvent feeder tube (left port).
2
S2
The S2 solvent inlet line (right port) and the
S2 solvent feeder tube (left port).
3
S3
The S3 solvent inlet line (right port) and the
S3 solvent feeder tube (left port).
4
S4
The S4 solvent inlet line (right port) and the
S4 solvent feeder tube (left port).
5
S5
The S5 solvent inlet line (right port) and the
S5 solvent feeder tube (left port).
Figure 13
6
7
8
.
Waste connections located on the back wall inside the system.
Port
Label
Connect
6
Waste outlet tube between the waste valve
and the waste reservoir.
7 + 8
Waste tube between the waste valve and
the extraction waste collector.
Figure 14
10
9
12
11
.
Connections located on the right hand side at the rear of the
system.
Port
Label
Connect
9
T4A-250VAC Electrical supply: 100 to 240 V~, 50/60 Hz,
300 VA
Fuses: T4A (2 required)
10
LAN
Network. Optional.
11
N
2
The gas applied to the samples through
the pressure head. See the gas supply
requirements in the technical specification
on page 6.
12
AIR
The gas used for the movement of the
pressure head. See the gas supply
requirements in the technical specification
on page 6.
Upgrade the Biotage
®
Extrahera
™
Software
Please refer to the instructions delivered with the new software.