HV-5000 Installation and Familiarization Checklist | Page 1
The following document will ensure that the installation is
complete and that all installation steps and tasks have been
performed. It will also provide guidelines for best practices
and familiarization of the system after installation has been
completed. The familiarization is intended to give the system
operators a basic overview of the operation and maintenance of
the new instrument, system, and software. Familiarization is not
intended or designed to substitute a full operator training course.
Familiarization will take up to a maximum of two hours.
We cannot guarantee a complete installation or demonstration
if the site requirements are not met. If you have any questions,
please do not hesitate to contact your local Biotage
®
1-Point
Support
™
group.
Please use the checklist below to track progress of both the
installation and familiarization and fill out this form electroni-
cally. A printed copy should be signed by both the Field Service
Engineer and Customer and given to the Customer after
completion.
Installation Checklist
Shipping Review
√
Tasks
Notes
Inspect the shipment carefully and verify that entire order has
been received.
Use the packing lists to confirm that no items are missing. Inspect
for any damages due to shipping. If the packaging or the instrument
has been damaged, confirm with the customer that the receipt of
Instrument document was completed and that a claim was initiated
with the shipping company.
Inspect the shipping containers for damage and review
contents for internal damage.
Site Preparations
√
Tasks
Notes
Ensure that the site requirements are met and that the final
instrument location is accessible and ready for installation.
If available, review the site preparation checklist document signed by
the Customer.
Ensure that N
2
gas is present at a pressure of 6 +/- 0.2 Bar.
Other inert gas option may be chosen.
Ensure that Air is present at a pressure of 6 +/- 0.2 Bar with
flowrate at 5 L/min
Ensure that the N
2
gas fulfils the quality required according to
ISO 8573-1, classification 1-6-1. Indicate if not used.
If the gas applied is not according to class x-6-x, an air dryer needs to
be ordered separately (P/N 416441SP).
Biotage
®
Extrahera
™
HV-5000 Installation
and Familiarization Checklist