INSTALLATION
TO AVOID SERIOUS PERSONAL INJURY, PROPERLY INSTALL
EQUIPMENT IN ADEQUATE WORK AREA
ALWAYS Use Qualified Technician and Electrician for Installation.
ONLY Operate on a Solid, Level, Non-Skid Surface.
NEVER Operate Machine With Product Mixer Safety Cover Opened or Removed or Safety Switch By-Passed.
ALWAYS Connect to Proper Voltage & Phase.
ALWAYS Install Equipment in Work Area with Adequate Light and Space Away from Children and Visitors.
ALWAYS Lock Machine Casters After Moving Machine.
NEVER Bypass, Alter, or Modify This Equipment in Any Way From Its Original Condition.
NEVER Operate Without all Warning Labels Attached and Owner/Operator Manual Available to the
Operator.
UNCRATING AND SET UP
1. Read this Manual thoroughly before installation and operation.
Do not
proceed with installation and
operation if you have any questions or do not understand anything in this Manual. Contact your local
Distributor, or BIRO
first.
2. Remove all banding, shipping carton, and all equipment from inside the tub. Then take machine off
shipping pallet.
3. Install machine on a level, non-skid surface in a well-lighted work area away from children and
visitors.
4. This machine is complete except for knife and plate. There is a bowl shipping plug (cardboard) placed
in the output end of the grinding bowl to retain the grinding auger during shipment.
REMOVE THE
BOWL SHIPPING PLUG AND THE GRINDING AUGER.
5. After checking and making sure the power supply is correct, plug in your machine.
NEVER OPERATE MACHINE WITH PRODUCT SAFETY COVER OPEN.
(Machine will not run with cover open or hopper removed.)
6. Machine must be properly grounded. Use qualified electrician to install according to local building
codes.
3
Summary of Contents for MINI-22
Page 2: ......
Page 16: ...13 OPERATOR S NOTES ...
Page 21: ...18 OPERATOR S NOTES ...
Page 22: ...19 ...
Page 23: ...20 ...
Page 24: ...21 ...
Page 26: ...OPERATOR S NOTES 23 ...