24
Installation Manual: BIPV Modules
23
Installation Manual: BIPV Modules
3�2�10 Mounting Screws for Battens
To mount the Solrif® battens to the counter battens, 2 wood screws with general building inspectorate approval in accordance
with roofing standards are required for each intersection of a Solrif® batten and counter batten:
3�2�9 Grounding and Lightning Protection
Notice
The national and local requirements regarding grounding and lightning protection must be observed.
A photovoltaic system does not affect whether lightning protection is necessary or not, i. e. a roof without a photovoltaic system
which does not have to be fitted with lightning protection does not need lightning protec tion even with a photovoltaic system.
If lightning protection exists, the photovoltaic system must be integrated into the lightning protection pursuant to the local
regulations. You will find further details in the tech note under your customer login at
www.ernstschweizer.ch.
Figure 16: Drilling work for grounding
1
Flashing top
2
Module
3
Cable strings
4
Grounding cables within a grounding string
5
Grounding cables between array and household fuse box
6
Holes (Φ 3.3 mm) for grounding (view onto top module edge)
Diameter Length
5 mm
Permissible shape of head
Thickness of the counter 60 mm Countersunk
3�2�11 Other Accessories
Fixing for flashing is used to mount the side flashing onto the Solrif® battens or tiling battens.
3.2.11.1 Fixing for Flashing
Figure 17: Fixing for flashing on flashing sidesgrounding
1
Fixing for flashing
2
Clout nail 2.5 × 25 mm