52
Installation Manual: BIPV Modules
51
Installation Manual: BIPV Modules
Figure 59: Fixing for flashing on flashing sides
Figure 56: Flashing top middleclamp
Figure 57: Flashing top left
Figure 58: Mounting protective profile
5�3�10 Finishing Process
1
Fixing for flashing
2
Clout nail 2.5 × 25 mm
7. Push the flashing top middle(s) into the mounting clamp underneath. The standing seams join up with the neighbouring
flashing tops.
8. Finish with the flashing top left. The left-hand seam of the flashing top covers the seam of the flashing side top left.
9. Connect the flashing tops with one another using protective profiles.