background image

INSTALLATION

5

4

BELOW

ABOVE

IMPORTANT

The outlet hose should be installed over as short a distance as possible with no kinks or bends.

We recommend that Blagdon hose is used.

CONNECTING INLET HOSES

The recommended hose size for

your Minipond UVC is stated in

the UVC performance and

specification chart.

Always secure hose with a jubilee clip.

Warming the hose in a bucket of

boiling water can aid fitting.

Always ensure that the smaller

diameter hosetail is cut off and

removed to prevent reduced UVC performance.

Use the shortest possible hose lengths to minimise flow restrictions.

Avoid folds and kinks in the hose, which will reduce flow and UVC performance.

Inlet to UVC

Recommended

INSTALLATION

CONNECTING TO YOUR PUMP

The pump supplying the Minipond UVC must not have a pumping head exceeding 4m - 0.4 Bar.

The maximum flow rate recommended is stated in the UVC performance and specification chart. 

This flow should not be exceeded.

The ideal flow rate for your pond is to pump the volume of the pond water through the UVC every 2-4

hours. To calculate your pond volume: average length (m) x average width (m) x average depth (m) x

1000 = Litres Pond Volume.

To calculate your pump’s flow rate, fill a container from the outlet hose of the UVC at the pond side. 

Time how long this takes in seconds e.g. a 10 ltr bucket takes 12 seconds to fill. Divide 3600 (the number of

seconds in an hour) by the time it takes to fill the bucket e.g. 12 seconds. Then multiply by the volume of

the container. e.g. 10 ltr. Therefore - 3600  ÷ 12 = 300 seconds 300 x 10 ltr = 3000 ltrs per hour flow rate.

To increase flow you may need to get a larger pump. If flow is too high use an inline valve to reduce it.

The purpose of the pump is to transfer green water from the pond to the Minipond UVC.

Placing the pump at the opposite end of the pond to the UVC will give the best results.

We recommend Blagdon Amphibious A Pond Pumps, Minipond 2000, Hydratech Multi or Hydratech

Torrent Pond Pumps.

UVC LAMPS & QUARTZ SLEEVE MAINTENANCE

The UVC lamp must be replaced every six months / once a season. It is recommended that the lamp is

replaced and reconnected in the spring.

The Quartz sleeve can become coated in lime scale build up in hard water areas. This should be

carefully removed from the quartz sleeve with a soft cloth.

Blagdon Pond Pump Cleaner should be used in stubborn cases.

Remove the quartz sleeve from the unit and soak for 3 hours in Pump Cleaner, ensuring that all O-rings

are checked and replaced, if necessary.

A wet test must be carried out after maintenance to ensure there are no leaks before the UVC is

reconnected.

WET TESTING THE UVC

IMPORTANT:

A wet test of the UVC under operating conditions must be carried out before

the UVC or electrical supply is installed.

Connect the UVC to the pump following all installation instructions.

After running for 24 hours check for leaks.

CONVENIENT INSTALLATION 

Minipond UVC can be used in conjunction with any in-pool or external filter for effective control of

green water.

MP_UVC_Instructions_AW.qxd  15/3/06  10:33 am  Page 4

Reviews: