Switch Box Mounting

See power status indicator lights diagram page 2 for status of the Switch box fuses. If one of the 
fuses fails the power indicator will not light on the switch that has failed. Please note that if the power 
supply to the switch box has been switched off or interrupted due to the RCD circuit breaker or fuse 
from the mains supply isolating the box none of the indicator lights will illuminate. Before replacing 
the fuse please check the manufacturer’s manual of the appliance that has caused the fuse to blow. 
The product may be faulty and in need of replacement or servicing by the manufacturer.

(1 x 5 AMP and 1 x 1.5 AMP spare fuses are located for your convenience on the circuit 
board.)

3. 

Remove the Switch box from its mounting bracket by lifting in a vertical action.

2.  

Remove the four cover locating screws from the back of the box.

3.   Having identified which switch fuse has blown (5 amp for switch 1 or 1.5 amp for subsequent  
 

switches), remove the blue fuse cover and gently remove the fuse with an electrical screwdriver.

4.  

Gently push the new fuse into place and replace the fuse cover (see page 2 for replacement  

 

fuse codes)

5.  

Replace the box cover ensuring that the cover seal is in place with the four screws at the back of  

 

the box.

6.  

Slide the Switch box vertically down onto the locating bracket. 

Maintenance

It is recommended that once a season the cover seal and rubber buttons are checked for wear and 
damage to ensure that a safe weatherproof seal is maintained. 

If signs of wear are shown, remove and replace the parts (spares codes and descriptions page 2). 
These should be readily available from your retailer.

IMPORTANT: 

Always switch off the mains power and isolate the Switch box before removing 

the cover.

Summary of Contents for Powersafe Series

Page 1: ...e due to a blown fuse Each switch has an individual fuse to provide overload protection ensuring that even if one or more items of equipment fail the other essential equipment is still able to functio...

Page 2: ...LIGHT Switch on or off Fuse has blown no power Individual switch power outlets Power Supply Status TECHNICAL SPECIFICATION CHART SWITCH BOX 2 WAY 3 WAY 4 WAY 5 WAY Voltage 220 240V 220 240V 220 240V 2...

Page 3: ...current not exceeding 30mA must be installed in the supply circuit This unit should be connected to a mains supply that is fused with a 13 amp fuse or 15 amp circuit breaker IMPORTANT Do not drill or...

Page 4: ...s Failure to comply is a criminal offence If the installation of this product is not carried out by a competent electrician who is registered under the Part P self certification scheme then you must n...

Page 5: ...d for a application This should be inserted to maintain a weatherproof seal INSTALLATION 5 IMPORTANT Please note that the mains input must be connected to the green power input cable block only Switch...

Page 6: ...cable gland see cable gland sealing diagram 12 Screw and hand tighten the cable gland cover that was previously threaded onto the cable to the cable gland Now repeat this process for all the applianc...

Page 7: ...lifting in a vertical action 2 Remove the four cover locating screws from the back of the box 3 Having identified which switch fuse has blown 5 amp for switch 1 or 1 5 amp for subsequent switches rem...

Page 8: ...atergardening co uk www pondaquariumproblemsolver co uk blagdon IMPORTANT 8 GUARANTEE This product is guaranteed against defects in material and workmanship for 3 years from the date of purchase under...