Operating Instructions
6-54DC 208-230v/460-480 3Ø 60HZ
Dust Collector
October
2005
© Copyright Blastrac 10/11/05
12
9. Compressor Start / Stop Buttons – Allows the operator to start or stop the
compressor with 120 volt control voltage circuitry.
3.7 Description and Function - Electrical Control Panel Cont’d
10. Blower Start / Stop Buttons – Allows the operator to start or stop the blower with
120 volt control voltage circuitry. Also energizes the timer board and associated
circuitry. The dust collector will not pulse unless the blower is running.
11. Elapsed Time Meter – Provides an indication of “run time” of the blower.