Operating Instructions
BG-250-230/60
Maintenance October
2005
7.3 Repairing
As already mentioned in Chapter 5 “Initial operation” we recommend
executing the first repair work on the machine under the supervision
of
Blastrac
personnel.
You should stock all spare or wear parts that cannot be supplied
quickly. As a rule, downtime is more expensive than the cost for the
corresponding spare part.
Screws that have been removed must be replaced with those of the
same quality (strength, material) and design.
Prior to any repair work on the machine and its drives, secure the
machine against unintentional starting. See chapter 2.6.
© Copyright Blastrac
Revision (A) 10-27-05
42