background image

www.blaubergventilatoren.de

B143-2EN-01

Summary of Contents for ISO-RB EC 100

Page 1: ...Centrifugal duct fan USER S MANUAL EN ISO RB EC...

Page 2: ...to the receiving operator CONTENTS UNIT INSTALLATION AND OPERATION SAFETY PRECAUTIONS Disconnect the unit from power mains prior to any installation operations Unpack the unit with care The unit must...

Page 3: ...t the electric parts of the unit against ingress of water Do not allow children to operate the unit Disconnect the unit from power mains prior to any technical maintenance Do not store any explosive o...

Page 4: ...s substances toxic substances dust pathogenic germs THE UNIT SHOULD NOT BE OPERATED BY CHILDREN OR PERSONS WITH REDUCED PHYSICAL MENTAL OR SENSORY CAPACITIES OR THOSE WITHOUT THE APPROPRIATE TRAINING...

Page 5: ...B B1 A1 A2 A3 A ISO RB EC 100 ISO RB EC 125 ISO RB EC 150 ISO RB EC 160 ISO RB EC 200 ISO RB EC 250 ISO RB EC 315 ISO RB EC 355 ISO RB EC 400 ISO RB EC 450 ISO RB EC 500 Unit voltage V 50 60 Hz 1 230...

Page 6: ...arrow on the fan casing UNIT DESIGN AND OPERATING PRINCIPLE INSTALLATION AND CONNECTION WHILE INSTALLING THE UNIT ENSURE CONVENIENT ACCESS FOR SUBSEQUENT MAINTENANCE AND REPAIR THE UNIT MUST BE MOUNT...

Page 7: ...ing to the markings 3 Fix the fan on the mounting brackets using the appropriate fasteners 4 Connecttheairducts purchasedseparately tothefanspigots 5 Unscrew the terminal box cover 6 Make the electric...

Page 8: ...section selection must be based on the maximum load current maximum conductor temperature depending on the wire type insulation length and installation method The external power input must be equippe...

Page 9: ...Prior to the initial power up after transportation at low temperatures allow the unit to warm up at room temperature for at least 3 4 hours DISCONNECT THE UNIT FROM POWER SUPPLY BEFORE ANY MAINTENANC...

Page 10: ...y does not apply to the following cases User s failure to submit the unit with the entire delivery package as stated in the user s manual including submission with missing component parts previously d...

Page 11: ...e user s manual The warranty terms are acknowledged and accepted Customer s Signature The ISO RB EC _______________________________ unit has been connected to power mains pursuant to the requirements...

Page 12: ...www blaubergventilatoren de B143 2EN 01...

Reviews: