background image

www.blaubergventilatoren.de

KoMFort roto ec S2(e)200

13

TECHNICAL MAINTENANCE

DISCONNECT THE UNIT FROM POWER SUPPLY BEFORE ANY MAINTENANCE 

OPERATIONS.

Maintenance operations of the unit are required 3-4 times per year. They include general cleaning of the unit and the following operations:

1. Filter maintenance.

Dirty filters increase air resistance in the system and reduce supply air volume. The filters require cleaning not less than 3-4 times per 

year. When 3 000 operating hours have elapsed, the unit controller generates the filter replacement or cleaning alert. Clean or replace 
the filters and reset the hour meter. Vacuum cleaning is allowed.  After two consecutive cleanings filters must be replaced.  For new filters 
contact the Seller.

Sequence of filter removal:
1. Disconnect the unit from power mains.
2. Remove the service panel.
3. Pull the filters to remove.

2. Heat exchanger maintenance (once per year).

Some dust may accumulate on the heat exchanger even in case of regular maintenance of the filters. To maintain the high heat 

recovery efficiency, regular cleaning is required.  To clean the heat exchanger, remove it from the unit and clean the heat exchanger by 
using compressed air or a vacuum cleaner. After cleaning, re-install the heat exchanger into the unit.

Sequence of heat exchanger removal:
1. Disconnect the unit from power mains.
2. Unlatch and open the service panel.
3. Disconnect the rotary heat exchanger and then pull it to remove.

3. Fan maintenance (once per year). 

Even in case of regular maintenance of the filters, some dust may accumulate inside the fans and reduce the fan performance and supply 

air flow.

Clean the fans with a soft cloth or brush. 
Do not use water, aggressive solvents, or sharp objects as they may damage the impeller.

4. Supply air flow control (twice per year).

The supply duct grille may get clogged with leaves and other objects reducing the unit performance and supply air delivery. Check the 

supply grille twice per year and clean it as required.

5. Ductwork system maintenance (once in 5 years).

Even regular fulfilling of all the maintenance operations prescribed above may not completely prevent dirt accumulation in the air ducts, 

which leads to air pollution and reduces the unit capacity. Duct maintenance means regular cleaning or replacement.

Summary of Contents for KOMFORT Roto EC S2 200

Page 1: ...Heat recovery air handling unit USER S MANUAL EN KOMFORT Roto EC S2 200 KOMFORT Roto EC S2E200...

Page 2: ...on of its products at any time in order to incorporate the latest technological developments No part of this publication may be reproduced stored in a retrieval system or transmitted in any form or by...

Page 3: ...r Protect the electric parts of the unit against ingress of water Do not allow children to operate the unit Disconnect the unit from power mains prior to any technical maintenance Do not store any exp...

Page 4: ...ain any flammable or explosive mixtures evaporation of chemicals sticky substances fibrous materials coarse dust soot and oil particles or environments favourable for the formation of hazardous substa...

Page 5: ...ineral wool Filter extract G4 supply G4 F7 Connected air duct diameter mm 125 Weight kg 47 48 Heat recovery efficiency from 75 up to 92 Heat exchanger type rotary Heat exchanger material aluminium SEC...

Page 6: ...hood The kitchen hood must be equipped with an air damper to shut off the exhaust duct when the kitchen hood is not in use Unit design and operation principle service side view Intake filter Extract...

Page 7: ...able access to the fan the spigots may be covered with a protecting grille or other protecting device with mesh width not more than 12 5 mm While installing the unit ensure convenient access for subse...

Page 8: ...and install the humidity sensor into the mounting bracket on the exhaust duct wall Then connect the humidity sensor connector to the respective contact socket on the control unit 1 2 3 Contact socket...

Page 9: ...the unit for floor mounting Then undo the four self tapping screws and remove the plug in the bottom panel Lead the kitchen hood cable into the unit and connect it according to the external connection...

Page 10: ...on selection must be based on the maximum load current maximum conductor temperature depending on the wire type insulation length and installation method The external power input must be equipped with...

Page 11: ...connector for the kitchen hood X4 is located on the side wall of the unit It is necessary to lead the cable into the unit and connect it to the connector according to the wiring diagram For right han...

Page 12: ...and the control panel Phone cable up to 50 m AWG24 shielded cable up to 200 m External connections diagram of the KOMFORT Roto EC S2 E 200 S21 XS11 X1 1 C 2 NC 3 4 N 5 L Grey Black Yellow green Blue B...

Page 13: ...ncy regular cleaning is required To clean the heat exchanger remove it from the unit and clean the heat exchanger by using compressed air or a vacuum cleaner After cleaning re install the heat exchang...

Page 14: ...air duct pipe flanges Install anti vibration connectors SYSTEM ALARMS Fire alarm Emergency system shutdown on command from the fire alarm board This alarm interrupts the fan operation In case of such...

Page 15: ...air the user must provide the unit the user s manual with the purchase date stamp and the payment paperwork certifying the purchase The unit model must comply with the one stated in the user s manual...

Page 16: ...www blaubergventilatoren de KOMFORT Roto EC S2 E 200 16...

Page 17: ...www blaubergventilatoren de KOMFORT Roto EC S2 E 200 17...

Page 18: ...www blaubergventilatoren de KOMFORT Roto EC S2 E 200 18...

Page 19: ...__200 S___ unit is installed pursuant to the requirements stated in the present user s manual Installation Stamp Company name Address Phone Number Installation Technician s Full Name Installation Date...

Page 20: ...www blaubergventilatoren de B140 1EN 04...

Reviews: