1
2
3
4
5
6
min 3°
1 - drain pipe; 2, 4 - drain hose; 3 - U-trap; 5 - sewage system; 6 - additional insulation.
The condensate drainage system is designed for normal operation in premises with air temperatures above 0 °C!
If the expected ambient air temperatures are below 0 °C, the condensate drainage system must be equipped with heat insulation and
pre-heating facilities.
SERVICE SIDE CHANGE
Right-handed installation Left-handed installation
Intake air
Intake air
Supply air
Supply air
Extract air
Extract air
Exhaust air
Exhaust air
Make sure of the correct unit service side selection. Unit mounting position should enable free excess to the opening plate for maintenance
and service operations. The plate opposite to the service side must be fixed with screws (included in the delivery set).
www.blaubergventilatoren.de
KOMFOrt EC S5(B) 270(-E)
12